My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by • <br /> 3P West Coast Products LLC <br /> 4 Centerpointe Drive <br /> DEC 16 <br /> 2004 La Palma,CA 90623 <br /> ENViRU!i, iII i_`d-f NLAL{Ii <br /> PERM! %SFRViCES <br /> December 7, 2004 DEL U ! <br /> Designated UST Operator Program <br /> County of San Joaquin <br /> Environmental Health Division <br /> 304 E. Weber Ave 3`d Floor <br /> Stockton, CA 95202 <br /> Re: ARCO Facility Number 06347 <br /> 2430 Joe Pombo Pkwy. <br /> Tracy, CA 95376 <br /> On behalf of BP West Coast Products LLC (BP), the owner of the underground storage <br /> tanks (USTs) at the subject facility, I hereby make the following representations. BP <br /> understands the underground storage tank (UST) requirements applicable to the subject <br /> facility. I have personally reviewed the results of the following: <br /> • Monitor Certification conducted October 13, 2004 <br /> • Compliance Survey conducted October 13, 2004 <br /> • Closure of issues identified by the Compliance Survey on October 13, 2004 <br /> Based on that review I believe that BP was in compliance with the applicable UST <br /> requirements on October 13, 2004. Furthermore, I am unaware of any information that <br /> would cause me to believe that such statement is no longer appropriate. <br /> BP will supplement this statement by January 1, 2005 with the name of the designated <br /> UST operator for this facility. <br /> Sin � rely, i <br /> rl <br /> Jo chetter <br /> En ' onmental Compliance Specialist <br /> BP West Coast Products LLC <br /> Compliance &Assurance <br />
The URL can be used to link to this page
Your browser does not support the video tag.