My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: 6347:2430 JOE POMBO P ,TRACY,CA 95376 D Test4n4n a�ervica _ ^® ^ G- <br /> MW <br /> F. InTankG /SIELEq4mzut �heck <br /> eck this box if gaugingis used only for inventory control. <br /> this box if no tank gauging or SIR aquipment is instelied. <br /> This section must be completed if in-tank gau&&equipment is used to perform leak detection monitoring. <br /> Complete the following clocklist <br /> Yes No* Has On input wiring been inspectedfor proper evitty and te ation,includingtestingforgroundfaults? <br /> ffYes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes Ho* Was accuracy of system product level readings tested? <br /> Yes No* I Was accuracy of system water level readings tested? <br /> Yes " No* Were all probes reinstalled propel? <br /> Yes No* Were allitemr,oaths equipment manufacturer'smaintenance checkist completed <br /> *In tke Secdox H,below,describe kow and when dme deMencies were or will be comcled. <br /> G. Line LeakDetectors ): Check this box ifLLDsare not installed. <br /> complete the fello clue <br /> es No* Fm equipment startup or annual aant c tification. was a leak simulated to verify LLD perfosmance? <br /> NIA (Check,�Il IW apply) Simulated leak rate: g p h l; 0.1 g p IL3; 0.2 g.p h.2 <br /> Notes: 1. Required for equipment startup certafication lad annual certification. <br /> 2. Unless mandated by local agency,certification required only for electrunic ILD up. <br /> as M No* Were ail LLDs confinned operational and accurate within regulatory requirements? <br /> as No* Was the to apparatus properly calibrated? <br /> YesP/A <br /> o* For mechanical s,does the LLD restrictproductflow ifitdetects aleew. <br /> MOTO$ No* For electronic LLDs,does the ' a automatically shut if the LLD detects a leak? <br /> NIA <br /> as No* Far electronic LLDs, does the a automatically shut off if any portion of the monitoring system is disabled <br /> NIA or disconnected? <br /> as No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoringsystem ctions <br /> NIA or fails a test? <br /> of No* For electronic LLDs,have all accessible connections been inspected? <br /> NIA <br /> as <br /> No* Were all items on the equ4ment ufacturer's maintenance checklist completed? <br /> * <br /> lathe Section H,bolow,denAADVIV how and wken these defieiencies vm or be corrwted. <br /> IL Comments: <br /> i <br /> i <br /> I <br /> 1 <br /> E <br /> Page 3 of 3 43MI <br />
The URL can be used to link to this page
Your browser does not support the video tag.