Laserfiche WebLink
Site Address: !6347:243010E POMBO I' ,TRACY,CA 95376 z.__. <br /> Dr ._. <br /> _TestsagJSeMcfng_ <br /> Moxitorin System Cerlirwzdox <br /> LIST Monitoring Site Plan <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> . . . . . . . . . : : : : : : : : : : : <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . -C�. . fes•. .. <br /> 0U qt. <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. <br /> Page of OSS <br />