My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. RETROFIT OR REPAIR 0 <br /> 1. Site map enclosed YES Fv/1 NO [ ] <br /> 2. Spec sheets attached for equipment to be installed YES P1 NO [ ] <br /> 3. Description of work to be completed: Remove all of the existing Veeder Root <br /> liquid sensors in the fill and turbine sumps and the UDC's <br /> and install new Veeder Root 794380-323 "Position Sensitive Sensors" <br /> sensors in their place. Once the sensors have been installed, we <br /> will perform necessary inspections and certify the new sensors. <br /> 4. Description of equipment to be used: <br /> (12) Veeder Root 794380-323 "Position Sensitive Sensors" <br /> See attached paperwork <br /> 5. All equipment is State certified or approved. YESa NO [ ] <br /> 6. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES [ ] NO [ ] <br /> b. Identify contractor performing decontamination: <br /> Name Phone( ) <br /> Address city Zip <br /> C. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br /> Hauler Name Phone( ) <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.