My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of -7 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ® Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution:0 to 15"Hg Vacuum <br /> Tank# Tank# yj Tank# Tank# <br /> Is Tank Exempt From Testing?' ❑Yes No ❑Yes No ❑Yes ❑No ❑Yes ❑No <br /> Tank Capacity: GALLONS GALLONS GALLONS GALLONS <br /> Tank Material: S CL <br /> Tank Manufacturer: <br /> Product Stored: 9ef—F0 <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: '-7 : H® 7 : 5 <br /> Initial Reading(Rj): —'(fl "HG ®10 "HG "HG "HG <br /> Test End Time: ° LAO � 96 <br /> Final Reading(RF): -- 10 -HG — 10 "HG "HG "HG <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R): "HG g -HG " HG "HG <br /> Pass/Fail Threshold or Criteria: Zero Zero Zero Zero <br /> :_. '.x xvafi k ' glxd2' <br /> NR maws" <br /> Was sensor removed for testing? 1t Yes ❑No ❑NA O(Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and �Z,� ®No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> COMMentS—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> BP Arco # 6347 <br /> 2430 Joe Pombo Pkwy <br /> Tracy, Ca 95377 <br /> SB 989 Testing <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. f California Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.