Laserfiche WebLink
Page 2 of -7 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ® Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution:0 to 15"Hg Vacuum <br /> Tank# Tank# yj Tank# Tank# <br /> Is Tank Exempt From Testing?' ❑Yes No ❑Yes No ❑Yes ❑No ❑Yes ❑No <br /> Tank Capacity: GALLONS GALLONS GALLONS GALLONS <br /> Tank Material: S CL <br /> Tank Manufacturer: <br /> Product Stored: 9ef—F0 <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: '-7 : H® 7 : 5 <br /> Initial Reading(Rj): —'(fl "HG ®10 "HG "HG "HG <br /> Test End Time: ° LAO � 96 <br /> Final Reading(RF): -- 10 -HG — 10 "HG "HG "HG <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R): "HG g -HG " HG "HG <br /> Pass/Fail Threshold or Criteria: Zero Zero Zero Zero <br /> :_. '.x xvafi k ' glxd2' <br /> NR maws" <br /> Was sensor removed for testing? 1t Yes ❑No ❑NA O(Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and �Z,� ®No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> COMMentS—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> BP Arco # 6347 <br /> 2430 Joe Pombo Pkwy <br /> Tracy, Ca 95377 <br /> SB 989 Testing <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. f California Code of Regulations,Title 23,Section 2637(a)(6)) <br />