My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Piping Leak Detection Monitoring Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> ® Sump leak sensors connected to Veeder Root 794380-208 <br /> continuous monitoring system <br /> Specify type: Continuous <br /> ❑ Discriminating <br /> ❑ Non-discriminating <br /> Mechanical line leak detectors with <br /> programmed leak threshold of three <br /> gallons per hour <br /> ® Electronic line leak detectors with Veeder Root PLLD 848480-001 <br /> programmed leak threshold of: Every pumping cycle <br /> ❑0.1 gph ❑0.2 9ph 03 gph <br /> ❑ Line integrity testing by: <br /> ❑ Electronic line leak detector is <br /> equipped to conduct line tightness ❑Annually <br /> testing ❑ Other: <br /> ❑Third party testing <br /> ® Not required <br /> ❑ Other(Specify): <br /> 4. Dispenser Leak Detection Monitoring Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> ❑Mechanical float in dispenser <br /> containment Continuous <br /> ® Electronic leak sensor in dispenser Veeder Root 794380-208 <br /> containment: <br /> El Discriminating <br /> Continuous <br /> ® Non-discriminating <br /> ❑Visual inspection ❑ Daily <br /> ❑Other: <br /> ❑ No under-dispenser containment <br /> ❑Other(specify): <br /> 5. Positive Shutdown Capabilities <br /> ❑System does not have positive shutdown capabilities <br /> ❑ Individual dispenser shutdown will occur whenever release is sensed in under-dispenser containment <br /> ®Automatic pump shut off will occur whenever: <br /> ® Release is sensed in turbine sump <br /> ® Release is sensed in primary piping <br /> ® Release is sensed at dispenser <br /> ®Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑ Other(specify): <br /> 6.Secondary Containment Testing <br /> ❑ Secondary containment is not tested <br /> ® In the State of California,secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003,and every 36 months thereafter. <br /> 7. Annual Equipment CertificatioNTestin <br /> ®Annually <br /> ❑Other(specify): <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.