My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 2:56:37 PM
Creation date
6/23/2020 6:57:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 14 11 10:02a Reliable Petroleu 204 -845-8953 p.14 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Subrr it minimum of 3 sets of plans&aPpfications as originals will be retained;by EHE)) <br /> 1. Site map enclose ? YES[] NO[V� <br /> 2. Submit I" <br /> copies C Service Technicrasn an&Or Insla�r's and all manufacturer training certifrgtes for <br /> each person ins, ling or testing any component that is repaired or . Ensure a copy of the-site Health <br /> and Safety Plan i avertable on the j as requ{red try Tf 8. <br /> 3. Detailed ciescripti of work to be completed. List components to be repaired or replaced and attach a diagram <br /> drawn to scale sh 'ng location of repairs and/or ants. If miring a component, describe how this will <br /> be done. (If ad piping, UiDC's, or ofher UST equipment, or performing tank top upgrade, use the LIST <br /> Installation Appy" tion pages 4-8 as necessary for a timely plan review): <br /> cum. <br /> i <br /> I <br /> 4, list of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> I <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.