Laserfiche WebLink
SWRCB,January 2002 page of <br /> 9. SMUOVERFILL CONTAE"IENT BOXES <br /> Facility is Not Equipped With S i1VOverfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tes <br /> `Fest Method Developed By: ❑Spill Bucket Manufacturer 0 Industry Standard ❑Professional Engineer <br /> 0 Other(Spec) <br /> Test Method L1�ed:4 0 Pressure 0 Vacuum 0 Hydra. <br /> 0 Other(Spec) <br /> Test Equipment Used: "" ., Equi esolution: <br /> Spill Bo Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> Stettin test: <br /> Test Start Time: <br /> Initial Reading(114): <br /> Test End Time: <br /> Final Reading(RF)' <br /> Test Duration: <br /> Change' eading(RF-RO: <br /> Pass/FA Threshold or <br /> Criteria: 4 <br /> Test Result: ❑ Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fsil <br /> Com ants— include in ormation on re airs made rior to t, tin , and recommended ollow-u or ailed tests <br /> `(� ®vim 1ti bXe� S 4 / . <br />