My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 2:56:37 PM
Creation date
6/23/2020 6:57:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 page of <br /> 9. SMUOVERFILL CONTAE"IENT BOXES <br /> Facility is Not Equipped With S i1VOverfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tes <br /> `Fest Method Developed By: ❑Spill Bucket Manufacturer 0 Industry Standard ❑Professional Engineer <br /> 0 Other(Spec) <br /> Test Method L1�ed:4 0 Pressure 0 Vacuum 0 Hydra. <br /> 0 Other(Spec) <br /> Test Equipment Used: "" ., Equi esolution: <br /> Spill Bo Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> Stettin test: <br /> Test Start Time: <br /> Initial Reading(114): <br /> Test End Time: <br /> Final Reading(RF)' <br /> Test Duration: <br /> Change' eading(RF-RO: <br /> Pass/FA Threshold or <br /> Criteria: 4 <br /> Test Result: ❑ Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fsil <br /> Com ants— include in ormation on re airs made rior to t, tin , and recommended ollow-u or ailed tests <br /> `(� ®vim 1ti bXe� S 4 / . <br />
The URL can be used to link to this page
Your browser does not support the video tag.