My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 2:56:37 PM
Creation date
6/23/2020 6:57:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes - ❑ No* Has all input wiring been inspected proper en an termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> Were <br /> a <br /> e <br /> all <br /> input <br /> wiring <br /> gauging <br /> rn g been <br /> inspec <br /> Has <br /> e <br /> :k gmg probes vi <br /> Was a system <br /> product <br /> accuracy <br /> t r <br /> s= <br /> cc cy 0 s I <br /> E] Yes Fl No* Was accuracy of system water level readings tested? <br /> I <br /> n Yes 0 No* Were all probes reinstalled properly? <br /> I <br /> W r 11 it ms 0 equipment <br /> manufacturer's maintenance checklist completed? <br /> El Yes n No* Were all items on the equipment <br /> In ,the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete the follo ing checklist: <br /> 0 Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> Com <br /> ' <br /> let <br /> e"' simulated to verify L7LDperfbrmajnc]e? <br /> FYe g.p.h. <br /> _t _h_7 <br /> g <br /> ts? <br /> Yes <br /> 0 <br /> 0 <br /> Z Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes ❑ No* Was the testing apparatus properly calibrated? <br /> [❑ <br /> 0 Y E:]�No* For mechanical LLDs,does the LLD restrict product now if it detects a leak? <br /> I Yes <br /> 0 N/A <br /> Y ❑ <br /> Yes <br /> El No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ <br /> 0 N/A <br /> disabled <br /> Y <br /> 0 RYes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is di <br /> ❑ N/A or disconnected? <br /> ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> tLj "I"k <br /> 0 Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 <br /> ❑ N/A <br /> gYes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Comments: <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.