Laserfiche WebLink
AIpnitorhig Syftem Certification <br /> 0 <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist- <br /> 0 Yes 0 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes 1 0 No* Was accuracy of system water level readings tested? <br /> 0 Yes 0 No* Were all probes reinstalled properly? <br /> 0 Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): 0 Check this box if LLDs are not kstalled, <br /> Com pleftethe fo wing checklist: <br /> 0 Yes 0 N For equipment start-up or annual equipment certffication, was a leak simulated to verify LLD performance? <br /> 0 N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.; 0 0.1 g.p.h; [10.2 g.p.h. <br /> 1 0 Yes 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes 0 No* Was the testing apparatus properly calibrated? <br /> 0 Yes 0 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 0 N/A <br /> 0 Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> 0 Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> 0 Yes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> 0 Yes [I No For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> [I N/A <br /> LLes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed?O <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 <br />