Laserfiche WebLink
SWRCB_ January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page 2 . <br />Facility is Not Equipped With Spill/Overtll Containment Boxes: <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer F1 Industry <br />Other (Specify) <br />Standard El <br />Professional Engineer <br />Test Method Used: <br />❑ Pressure ❑ <br />El Other (Specify) <br />Vacuum Fx] <br />Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Bucket Diameter: <br />Spill Box# 1-87 1-87/EAS <br />SpillBox#1-87 1-87/WAS <br />Spill Box# 2-87 2-87 <br />Spill Box# 3-91 3-91 <br />loll <br />101, <br />10, <br />10" <br />Bucket Depth: <br />1511 <br />1511 <br />1511 <br />1511 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 MIN. <br />5 MIN. <br />5 MIN. <br />5 MIN. <br />Test Start Time: <br />9: 3 0 <br />9: 3 0 <br />9: 3 0 <br />9: 3 0 <br />Initial Reading (RI ): <br />11" <br />11" <br />11" <br />11" <br />Test End Time: <br />10: 35 <br />10 : 35 <br />10: 35 <br />10 : 35 <br />Final Reading (RF ): <br />9" <br />9" <br />ill, <br />11" <br />Test Duration: <br />60 MIN. <br />60 MIN. <br />60 MIN. <br />60 MIN. <br />Change in Reading (R F - Rt) <br />2" <br />i" <br />0" <br />0" <br />Pass/Fail Threshold or <br />Criteria: <br />FAILED <br />FAILED <br />PASS <br />PASS <br />ME <br />WIN <br />REF RE -02 "i <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />OPW SPILL BUCKET'S ON SITE. <br />