My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_1997-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 3:34:59 PM
Creation date
6/23/2020 6:57:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2003
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_1997-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form 1 <br /> Source Test Tesults <br /> Static Leak Test <br /> Date: 05/10/2000 Time: 14:00 Application No. <br /> GDF Name and address: 32262 2360 GRANTLINE,I-205 OFF RAMP <br /> Stage II system (check one): Vapor Balance [ ] Single Hose M.P.D. [X ] <br /> Vacuum Assist [X ] Type: GILBARCO <br /> Stage I type (check one): Two point [X ] Manifolded? Yes [ ] <br /> Coaxial [ ] No [ ] <br /> Tank# 1 2 3 <br /> Product grade REG PLS PRM <br /> Actual tank capacity (gallons) 15046 10028 10028 35102 <br /> Gasoline volume (gallons) 5639 7482 5696 18817 <br /> Ullage (gallons) 9407 2546 4332 16285 <br /> Initial pressure of UST, inches H2O 2 2 <br /> Number of nozzles served by tank 12 12 <br /> Test location: (A) Stage I vapor <br /> coupler of(B)Stage II riser A <br /> Initial Pressure, inches H2O (2.0) 2 <br /> Pressure after 1 min. (inches H2O) 1.99 <br /> Pressure after 2 min. (inches H2O) 1.98 <br /> Pressure after 3 min. (inches H2O) 1.97 <br /> Pressure after 4 min. (inches H2O) 1.96 <br /> Final Pressure after 5 min. (inches <br /> H2O) 1.95 <br /> Allowable Final Pressure: Table 1 A, <br /> Table 113,Equations 9.1, 9.2 1.93 <br /> Test Status [Pass or Fail] Pass <br /> Tests Conducted By: MLEVESQUE <br /> Test Company: TANKNOLOGY Date of Tests: 05/10/2000 <br /> Tests Witnessed By: N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.