Laserfiche WebLink
19. Piping (cross-sectional d , including connections to tank and dfsp, <br /> (A) vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (Section 2635 (b) (2) (B) or (C)], or <br /> Provide positive shut off of flow to the tank at no more than 95 X [Section 2635 (b)(2)(C)], or <br /> (B) X vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atnospherie pressure) [Section 2636 (a) (3)] <br /> sloped so contents of the pipe wilt drain back into the storage tank if the suction is <br /> released. <br /> go valves or pulps; installed below grade. <br /> Inspection method provided to demonstrate corsptiance with section 2636 (a) (3). <br /> (D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (£) Underground primary piping will meet all of the following requirements <br /> kPrimary piping.In contact with hazardous substance under normaloperation conditions shalt be: <br /> installed inside a secondary containment system in the form of:x secondary pipe_Vault or <br /> _lined trench to be stoped to a collection sup at the tow point of the piping. • <br /> kPrimary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> xSecondary containment wilt be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> X Automatic lintk}eak detectors wilt be installed on ore8sur;--A_pipfn9 <br /> Manufacturer. vc;L )mss _ Kodet: L-0 2_00C � <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the cont! nitaring system <br /> fails or is disconnected. <br /> 20. State Vater Resources Control Board "Facility (A)" and "Tank Permit (B)" appticatior subaitted. <br /> 21. X Plan review and operating permit fees paid. f 7Z <br /> 22. XWhat is the approximate depth to ground water: `2 *' ' <br /> (lnctude source of information - borehole logs, monitoring well data, water <br /> studies, etc.) <br /> x: � ct <br /> 23. ki Total number of tanks on site after instattation: �,\ � <br /> 24. X County/City fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to FRS-£HO Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner or operator cost acknowledge this responsibility for workplan submitta[ by.signature and date below. <br /> 'Name ' Titte <br /> Date <br /> CONDIT10Ns'OF APPROVAL: <br />