Laserfiche WebLink
UST SYSTEM DRAWING INFORYATION <br /> 1. Three co-plete sets of d ens (inclu:'e manufacturer's specifi;:::i_:) sheets for proposed egjip:. nt to be instalie4). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below accessible open <br /> 5. Tank cross-sectional diagram. NOV 2 6 1997 <br /> 6, Detail of tank, associated piping, excavation and cover. - ,Vf <br /> ROWNTAL HEA <br /> 7. �' Tank(s) and piping z-;roved by a nationally recognized indepereent testing QMF4WRV4C6VI <br /> t a 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> 8. Verification of product corpatibitity with the tankCs), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (1°) and <br /> secondary (20) contairyrent systems before covering. (Section 2635 (a) (3) & (4)) <br /> 11. Tank integrity test required upon cor;9letion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing co-;any or owner of facility. (Health b Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)) <br /> 12. TANK COKPOSITIOH <br /> TANK � g I "...Z.. . . . $. # <br /> CAPACITY ,oc> 101 00C�l <br /> Y.ARUFACTURER TG 1 -7 e_ f <br /> COMPOSITION fL s�2. f s4 <br /> MODEL <br /> PRODUCT eL <br /> CORROSION PROTECTION Y Y Y <br /> U.L. LISTED Y �f <br /> COMPATIBILITY WITH 100% Y <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> XA. Steel-clad with fiberglass reinforced plastic coatings, cocaposites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> x (2) Vaansn applied to interstitial space. <br /> B. Fiberglass <br /> _- (1) Installation instructions require an air test and seep bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular Cprimary tank pressure test). ' <br /> C. Non-clad steel tank (Section 2635 (a) (2) (A)D <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, hashers. <br /> etc.). <br /> (2) Fietd installed cathodic protection systems designed and certified asadequate by a° <br /> corrosion specialist. <br /> (3) lopressed current systems to be inspected no less than every 60 days. <br /> 5 <br />