Laserfiche WebLink
19. Piping (cross-sectional d.m, including connections to tank and disps). <br /> (A) Vent and tank riser primary contain Ont system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (Section 2635 (b) (2) (B) or (C)], or <br /> Provide positive shut off of flow to the tank at no more than 95 % (Section 2635 (b)(2)(C)), or <br /> (B) X Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below, grade•piping operates at less than atmospheric pressure) (Section 2636 (a) (3)) <br /> sloped so contents of the pipe wilt drain back into the storage tank if the suction is <br /> released. <br /> No valves or ptrrps installed below grade. <br /> inspection method provided to demonstrate compliance with section 2636 '(a) (3). <br /> (D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (£) Underground primary piping will meet all of the following requirements <br /> Primary piping.in contact with hazardous substance under normal operation conditions shall be: <br /> Installed inside a secondary containment system in the form of:X secondary pipe Vault or <br /> _lined trench to be sloped to a collection sure at the low point of the piping. <br /> kPrimary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> X Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> XAutomatic line_ leak detectors will be installed on oressurs+.,4 piping <br /> Manufacturer: e3 ) Model: LL's 2—C s� <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> -L, Anrxul line tightness test will not be required if the continuous monitor shuts down the perp and <br /> activates the alarm system when a release is detected and when the conti n(toring system <br /> fails or is disconnected. <br /> 20. State [tater Resources Control Board "Facility (A)" and "Tank Permit (B)" applicatio � u itted. <br /> X n . <br /> 21. Plan review and operating permit fees paid. �100 <br /> !f I <br /> 22. X What is the approximate depth to ground water: <br /> (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.) s <br /> 23. Total number of tanks on site after installation: ��lr. <br /> 24. x_• County/City Fire District and Building Department notified. <br /> 25. 1n the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements) as an owner or operator to submit a workplan to PHS-£HD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner oc•operator must acknowledge.this responsibility for workplan submittal by.signature and date below. <br /> Name Title <br /> Date. <br /> CONDITIOHS`OF APPROVAL: <br /> Civ' <br /> g <br />