My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_1997-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 3:34:59 PM
Creation date
6/23/2020 6:57:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2003
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_1997-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 within 30 <br /> days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making the change. <br /> Required by CCR 2632(d)and 2641 (h). <br /> FACILITY NAME 7-Eleven#32262 DATE 7/7/03 <br /> FACILITY ADDRESS 2360 Grantline,Tracy,CA <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> The store operator is responsible for performing the monitoring. <br /> Sacramento Maintenance and Equipment performs the maintenance on the equipment <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS Continuous interstitial monitoring PIPING Continuous sump monitoring <br /> 3.Describe the location(s)of where the monitoring will be performed. ie: location of sensors <br /> The interstitial sensors for the tanks are located in the interstitial spaces at the end of each tank. The piping <br /> sensors are located in each tank's turbine sump. <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel VeederRoot TLS350 <br /> Name and Model of Line Leak Detectors <br /> Vaporless PLLD <br /> Name and Model of Annular Sensors VeederRoot#794390-420 <br /> Name and Model of Piping Sensors VeederRoot#794380-352 <br /> Name and Model of Dispenser Sensors VeederRoot#794380-208 <br /> Type of overfill prevention Emco Wheaton A 1100 <br /> S.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes® No D <br /> Does the turbine shut down if a sensor is disconnected? Yes® No D <br /> Does the turbine shut down is the monitoring panel loses power? Yes® No D <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> The alarm history will be stored in the VeederRoot Tank Gauge and available via printout. <br /> Maintenance records will be recorded on an equipment maintenance log and stored at the site. <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br /> annual monitoring certification be performed in? Maintenance and repair of the equipment is performed as <br /> needed. The VeederRoot TLS350 is certified in the month of May. <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems must be <br /> tested once every 36 months with initial testing performed before December3l,2003. <br /> 8. Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment. Training is provided for new employees. Training refreshers are offered as needed. The operations <br /> manual for the equipment was provided to the store operator when the equipment was installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.