My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 3:57:05 PM
Creation date
6/23/2020 6:58:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`supervision of a trained, experienced supervisor. In addition they have 8-hour refresher training each <br /> year. <br /> Certifications of training are available upon request. <br /> PROJECT WORKPLAN <br /> All work at the site will be conducted in accordance with applicable state and federal regulations, the <br /> project specifications, and Glacier's Site Safety and Health Plan. <br /> Following the approval of this plan and receipt of applicable permits, Glacier will mobilize the necessary <br /> manpower, equipment and materials to the site to begin work. The duration of work at each site is <br /> estimated to be an average of 10 workdays. <br /> Glacier proposes to complete the following tasks associated with completion of the work: <br /> • Submit this Workplan; permit applications, and applicable fees to the San Joaquin Environmental <br /> Health Department for a piping repair permit <br /> • Submit applications for Authority to construct to the San Joaquin Valley Air Pollution to install <br /> Phase I EVR. <br /> • Conduct both one-call and private utility locates to identify buried utilities in the area of <br /> work/excavation. <br /> • A preconstruction safety meeting will be held at the site prior to beginning of site work. The <br /> meeting will be attended by the Glacier Safety and Health Manager, Site Safety and Health <br /> Officer(SSHO), and Project Superintendent. <br /> • Electrical energy supplying fuel dispensers, product pumps and monitoring systems will be <br /> disconnected, locked and tagged out per the Site Safety Health Plan. <br /> • Prior to commencement of work the work area(s) will be enclosed with six-foot tall temporary <br /> chain link fence. No smoking signs will be posted in conspicuous locations and employees or <br /> other visitors will be prohibited from carrying matches or lighters into the work area. Two 20- <br /> pound ABC dry chemical extinguishers will be located within the immediate vicinity of the work. <br /> • During all work, Glacier will maintain a ready supply of drip pans and spill cleanup equipment <br /> including a spill kit consisting: <br /> 1 bale 3M Type 156 absorbent pads <br /> • 140 pound bag of granular absorbent(kitty litter) <br /> • 6 each poly spill bags <br /> • Glacier will provide adequate clothing and equipment for the work and protection of personnel. <br /> Personal protective equipment including respiratory protection is described in the attached Site <br /> Safety and Health Plan. <br /> • Fuel dispensers will be drained, capped or plugged and removed from the pump island(s) and <br /> stored on-site for reinstallatioh. <br /> • Existing primary and secondary piping will be trenched, excavated and removed. Prior to <br /> removal, primary product lines will be drained back to the tanks where possible or pumped dry <br /> with pneumatic equipment. <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.