My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 3:57:05 PM
Creation date
6/23/2020 6:58:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jun . 5 . 2003 9 :22AM Gla 6 <br /> Environmental No ,0651 P. 3 <br /> HOLODOWN STRAPS: , <br /> Xerxes FRP straps must be used when a tank is to be anchored. <br /> The location of holddown straps for each tank is marked on the WARNING,Do not use air pressure to test tanks that contain <br /> tank by the arrow(><)symbol.Complete data for holddown flammable or combustible liquids or vapors.The fuel/air mixture <br /> straps are given in Figure 7-2 and Table 7-2, may explode and muse death,severe personal Injury or property <br /> CAUTION:Place the sups only In the locations designated by the damage.Tanks that will be ballasted with a flammable product <br /> arrow symbol(><), should be air tested before ballasting. <br /> To evenly distribute buoyancy loads,tighten all holddown straps WARNING:If product Is used as ballast,exercise special care In <br /> uniformly until they are snug over the ribs but cause no deflection handling.Safeguard against sparks,fire or product spills.improper <br /> of the tank.Make an Intermediate measurement of the tank dWT& handling of product can cause a fire or explosion,and may result <br /> ter AFTER the stray have been Installed and tightened. In death,severe personal injury or properly damage. <br /> HARDWARE AND ANWRIN01 POINTS: INTERMEDIATE DEFLECTION MEASUREMENT <br /> Armoring hardware and anchor pointe must be shed according After backfill Is brought to the top of the tank,make an intermediate <br /> to Table 7,3.The installing contractor Is responsible for providing measurernemt of kcal deftection wording to the instnctions <br /> hardware and anchor points of sufficient strength,The particular In Section 13, <br /> configuration of hardware will be determined by the owner or the TEST <br /> owners representative. the anchor points as shown In After the tank has been measured and vmtcal detiedion Is deter- <br /> Table 7-2.Infer to dirnansion"E".Align all anchor points with the mind to be within the limits specified by Ymm.ft tank must be <br /> marked(><)loogm on the tanks,within atolerarce of t 1".For tasted to ensure that no damage occurred during installation.The <br /> specific Information on hardware,cable,able clamps and their procedure in Section 2 Pre-Installation Testing should be fold, <br /> use,consult the manufacturers of these iters. soaping all exposed areas of the tank and all fittings. <br /> Because most of the tank exterior is no longer visible,the tank <br /> TABLE 7.3 must be lested by acting the gauge at the test manifold for any <br /> TANK s,Mo& 4,01111• elm- drop In pyre,Carefully relieve tine pressure in the tank and <br /> rtlr Below elm GREATER remove the hosaftive assembly from dry Double Wall tanks. <br /> WIRE ROPE DIA 3r 1/23 1Z <br /> (6 x 19 IPS) <br /> TURNBUCKLE DIAWARNING: not use 91r pressure to test tanks that contain <br /> JMNYE HOOK12' 50 <br /> p 3/4° e or combustible liquids or ors. aIr mixture <br /> may explode and cause death,severe personal Injury,or property <br /> OR RATING ) 9, 21, 25, .Tanks that will be ballasted with a flammable product <br /> should be air Itested before biillastlng, <br /> WARNING:If product Is used as Mast,exerclas specW cars In <br /> handling.Safeguard against sparks,fire or product spills.Improper <br /> handling of product can cause a fire or explosion,and may rift <br /> In death,severe personal injury or property <br /> The tank may be ballasted after the backfill is even with the top <br /> of the tank and pW4nstallstlon testing has been successfully <br /> completed.Only under wehole conditions as described In <br /> Section 6,should ballast be added before the backfill Is evert with <br /> the top of the tank,When filling the tank,male sura the tank Is <br /> properly vented.The sent must be large enough to allow the <br /> displaced air to escape, <br /> o a, g ii4�q I• <br /> T111 9-4111111-9411111 ME#III IM11 11119 <br /> 11OTE:Al at the holdit nr sups,turnbuckles and/or thr rod <br /> must be=W or Owtmd to prdvemt conft, <br /> M.When fastening Wre cable,km a*imam of three demes an each tont <br /> Use shadb4pe or ddmM dwa as appmrhde. <br />
The URL can be used to link to this page
Your browser does not support the video tag.