Laserfiche WebLink
ANCO LEGEND: <br /> O� OST L Rp ® DESTROYED TANK PIT OBSERVATION POINT <br /> 51 <br /> 0 NO) ® TANK PIT OBSERVATION POINT <br /> skv GlFt� • TANK PIT SAMPLE LOCATION <br /> — — — FUTURE REMEDIATION LINES.(2)2-INCH <br /> AND(1)1-INCH PVC PIPING. <br /> a CHEMICAL ANALYTICAL RESULTS: <br /> VAULT BOX ANALYTE <br /> fi LTPHg <br /> ID W3 <br /> ,0 000 <br /> Qcci <5CONCENTRATION(Ng/L) <br /> 26,000 <br /> PUMP ISLAND— <br /> SLAB&CANOPY � 3 ANALYTES: <br /> O TPHg TOTAL PETROLEUM HYDROCARBONS <br /> DISPENSER AS GASOLINE <br /> B BENZENE <br /> p MtBE METHYL TERTIARY BUTYL ETHER <br /> NOTES: SAMPLES W1 AND W2 COLLECTED ON MAY 3,2003 <br /> { BEFORE BOTH TANK PIT OBSERVATION WELLS <br /> WERE DESTROYED.AS A RESULT OF EXPANDED <br /> l J EXCAVATION TANK PIT OBERSERVATION WELL <br /> TP-1 WAS LATER REINSTALLED.SAMPLE W3 <br /> COLLECTED ON JUNE 2,2003. <br /> SAMPLE ID w1 <br /> TPHg <50,000 <br /> B <500 TP-1USTS <br /> t LISTS <br /> MtBE 510,000 \\ <br /> 7-ELEVEN <br /> #32262 ` �-j} \TP-2 SAMPLE ID W2 <br /> N € a B Hg <250� <br /> 1 i MtBE 110,000 <br /> SAMPLE ID W3 PHONE <br /> XIp TPHg <5,000 <br /> fC B <50 , C) <br /> sS> MtBE 26,000 <br /> o <br /> �'p FUTURE REMEDIATION LAMP <br /> VAULT BOX N <br /> VENT LINE <br /> AIR&WATER <br /> O� <br /> � Cg v 0 40 80 <br /> APPROXIMATE SCALE FEET <br /> DRAWN BY: PR PREPARED BY: PREPARED FOR: <br /> REFERENCE: THIS FIGURE IS BASED ON A'SITE PLAN" CHECKED: DC 7-ELEVEN FIGURE 3 <br /> PROVIDED BY ROYSTON,DATED APPROVED: JSA STORE#32262 GROUNDWATER SAMPLE <br /> SEPTEMBER 2002,AND IS INTENDED FOR 0 <br /> ILLUSTRATION ONLY. DATE: 8/29/03ANALYTICAL RESULTS AND <br /> ® <br /> JOB NO.: 77EL.32262.03 2360 WEST GRANT LINE ROAD REMEDIATION PIPING LAYOUT <br /> CAD FILE: SITE PLAN 3017 KILGORE ROAD,SUITE 900 <br /> RANCHO CORDOVA CA 95670 TRACY,CALIFORNIA <br />