My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 3:57:05 PM
Creation date
6/23/2020 6:58:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> NEW UST INSTALLATION INSPECTION RECD <br /> FACILITY NAME: ADDRESS: O 141 . <br /> 1 <br /> PR# TANK# v UL#AZo+),-f TANK MODEUMATERIAL: Awe<u'o jiL' <br /> O <br /> COMPARTMENTALIZED TANK? (If yes, complete one form for each tank) ❑YES NO <br /> TANK CAPACITY: t G) , ©po PRODUCT: <br /> DATE A INITIALS <br /> P <br /> P <br /> R ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE WITH MANUFACTURER WRITTEN <br /> SPECIFICATIONS <br /> E <br /> D <br /> 1. UST PLANS SUBMITTED AND FEES PAID (H&S CODE SECTION 25287 <br /> 2. UST INSTALLATION PLANS APROVED <br /> INITIAL INSPECTIONS <br /> 3. INSP TION AND T ST OF SECONDARY C NMENT: HOLIDAY TEST: VACUUM: <br /> I 0 SOAP: PSI: HRS/MIN: ftBRINE IQUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL API/PEI <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST MINIMUM 40 PSI/30 MIN CCR 2636 e <br /> 10) <br /> 7. SECONDARYPIPING CONTAINMENT TEST: PSI: HRS/MIN: o THER: CCR 2636 e 8. LAKE TEST ON ALL SUMPS 24 HR MINIMUM HRS: CCR 2635 a 4 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br /> 10. OVERSPILL PERFORMANCE TEST CCR 2635 b 1 C11.ALL PIPING AND FITTINGS CORROSION PROTECTED CCR 2636 b 12. PIPING SLOPES TO COLLECTION SUMP CCR 2636 c 1 <br /> FINAL INSPECTION <br /> MO V1 A 13. PERFORMANCE TEST FOR"ALL"MONITORING PROBES FCCR 2632 c 2 <br /> 14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM CCR 2632 c 2 <br /> 15, PERFORMANCE TEST OF LINE LEAK DETECTION CCR 2643 c 1 <br /> 16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT OFF ICCR 2636 <br /> CA 18. OVERFILL PROTECTION INSTALLED AND APPROVED ICCR 2635 b 2 <br /> 19. TANK ACCESS PORTS BROUGHT TO GRADE LOCKED AND WATERTIGHT API <br /> 20. TANK INTEGRITY TEST PERFORMED HARD COPY SUBMITTED CCR 2635 a 5 <br /> 21. MONITORING PLAN RESPONSE PLAN AND LOG BOOK ON SITE FCCR 2632 d <br /> 22."C"FORM COMPLETED AND SUBMITTED ICCR 2635 d <br /> TA 23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED FCCR 2630-2636 <br /> 24. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H&S CODE 25284 <br /> COMMENTS <br /> EH23 006 3/18/02 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.