My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 3:57:05 PM
Creation date
6/23/2020 6:58:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e, a <br /> 00 <br /> UST SYSTEM DRAWING INFORMATION <br /> 1. X_ Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be <br /> installed). <br /> 2. _ Plans drawn to scale in non-erasable print. <br /> 3. _�_ Plot plan to show location of tanks and all associated piping. <br /> 4. _X_ Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. _X_ Tank cross-sectional diagram. <br /> 6. _ _ Detail of tank,associated piping,excavation and cover. <br /> 7. Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3,Section 2631 (b)&2635] <br /> g, Verification of product compatibility with the tank(s),piping,monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. X_ Manufacturer's written installation instructions for tank(s),piping,monitoring devices,etc. <br /> 10. _ _ At the installation site,prior to installation,a tightness test shall be performed on both primary(1)and secondary <br /> (2)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code,Division 20, <br /> Chapter 6.7,Section 25291 (h)] <br /> 12. TANK COMPOSITION p ^,� <br /> 1 <br /> MODF <br /> F IXi lig <br /> A 7" 11 4)+rt1T 11 WT !I <br /> PROD ICT <br /> w ! � <br /> CORROSION <br /> III IIATFD <br /> COMPATIBILITY c <br /> WITH 100% 7e 5 �f✓5 <br /> 13. TANK(s)TO BE INSTALLED <br /> _ A Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> y� (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.