My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 11:45:34 AM
Creation date
6/23/2020 6:58:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_2016-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: W Check this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />0, Yes <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Yes <br />No* <br />Was accuracy of system product level readings tested? <br />Yes <br />No* <br />Was accuracy of system water level readings tested? <br />+` Yes <br />No* <br />ere all probes reinstalled properly? <br />IT, Yes <br />r Yes <br />r No* <br />ere all items on the equipment manufacturer's maintenance checklist complete . <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): r Check this box if LLDs are not installed. <br />Complete the following checklist: <br />MAR 13 2097 <br />ro Yes <br />r No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD c all that <br />apply) Simulated leak rate: F3 g.p.h.; 0.1 g.p.h; 0.2 g.p.h. <br />N/A <br />•' Yes <br />r No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />e Yes <br />r No* <br />Was the testing apparatus properly calibrated? <br />IT, Yes <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />:.: Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />Yes <br />No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />N/A <br />Yes <br />r No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />monitoring system malfunctions or fails a test? <br />,' N/A <br />Yes <br />r No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />ro N/A <br />*' Yes <br />No* <br />1were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.