Laserfiche WebLink
E <br />0 <br />0 10 20 40 60 80 <br />71.7%.77 <br />SCALE: 1"=20'-0" <br />5 -GALLON SPILL BUCKET W/ <br />VAPOR RECOVERY <br />GENERAL NOTES <br />S.S. SLEEVE AND '0' RING <br />ADAPTOR AND CAP <br />1. IN THE EVENT OF OSCREPANpES BETWEEN THE DRAWINGS, SPECIFICATIONS, OR <br />° DEBRIS BUCKET AND GASOLINE HAND PUMP 36" MULTI PORT MANHOLE <br />HATH LIQUID TIGHT FILL Box <br />SP1 <br />APP. <br />SCOPE OF WORK SUMMARY IN THIS PACKAGE. NOTIFY CHEVRON REP. IMMEDIATELY. <br />SUMP SHIELD <br />4' TOP SEAL <br />ADAPTOR AND CAP <br />2. THE CONTRACTOR IS RESPONSIBLE TO SEE THAT WORK IN FIELD IS DONE IN <br />API COLORED ID MARKERS <br />ACCORDANCE WITH ALL CURRENT APPUCABLE NATIONAL. STATE & LOCAL CODES. <br />ORDINANCES & REQUIREMENTS BY GOVERNING AGENCIES. WHETHER qi NOT SAID <br />REQUIREMENTS. ARE SPECIFICALLY SHOWN ON DRAWNCS <br />ORDI ANCED <br />4 1 /2" FROM a <br />A <br />ES,, <br />AND/OR <br />TOP OF SPILL <br />° <br />BUCKET TO TOP d ° ° ° ^ <br />d d " <br />3. THE CONTRACTOR SHALL PROTECT ALL EXISTING ITEMS AND FACILITES TO REMAIN <br />THROUGHOUT CONSTRUCTION. CONTRACTOR SHALL REPAIR AND/OR REPLACE, AT <br />OF STEEL SLEEVE eo d o <br />CONTRACTOR'S EXPENSE, ANY EXISTING ITEMS AND FACILITIES TO REMAIN THAT <br />do <br />ARE DAMAGED BY THE CONTRACTOR'S OPERATIONS, TO THE SATISFACTION OF THE <br />PEA GRAVEL <br />CHEVRON REP. <br />1 <br />4. UNLESS IS BY CHEVRON TO JOB SITE. CONTRACTOR SHALL DELIVER <br />-- I <br />UIPENY <br />SUCH EQUIPMMENT, DAMAGE -FREE i0 THE JOB SITE. <br />I <br />5. PRIOR TO EXCAVATION. DETERMINE AND VERIFY LOCATION OF UTILITY SERVICES IN <br />I <br />ALL AREAS TO BE EXCAVATED. <br />d' RISER ADAPTER PRIMED AND WRAPPED <br />I <br />I <br />6. THE CONTRACTOR $HALLNPLY ALL PERTINENT LAWS, CODES, <br />4' ALUMINUM FILL VIBE <br />1 <br />REGULATIONS, UBC, GOVERNING AGENCENC IES & MANUFACTURER $PEpFICATIONS. <br />NOTE: FLANGE IS ON TUT OF <br />1 <br />4" $CH. GALVANIZED RISER <br />UNLESS GREATER REQUIREMENTS ARE INDICATED. AND/OR ARE NECESSARY FOR <br />RISER ADAPTOR SEAL <br />I <br />I PRIMED AND WRAPPEEDD <br />THE SAFETY OF THE PROJECT, <br />17. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING JURISDICTIONS AS <br />2's 12' EZ -FIT FLEXIBLE CONNECTOR <br />1 3'x12' EZ -FIT FLEX <br />CONNECTOR <br />REQUIRED FOR INSPECTIONS. <br />2" EZ -FIT X FG CONNECTOR <br />1 <br />1 TANK FITTING <br />I EXIST. VAPOR <br />WITIR A <br />8. THE CONTRACTOR SHALL PROVIDE S CHEVRON T E WOW. A QUALIFIED <br />CUNSTRUCTIDN SCHEDULE PRIOR TO STARTING THE WORK, A QUALIFIED JOB <br />FIBERGLASS TERMINATION FITTING <br />I RECOVERY UNE <br />SUPERINTENDENT THROUGHOUT THE PHOTOS SHOWING WORK PRIOR TO <br />1 <br />FWORK.ALL <br />BACNFILI,. AND RECORD DRAWINGS OF ALL UNDERGROUND CONSTRUCTION. <br />CORD D <br />9. THE CONTRACTOR SHALL PROVIDE BARRICADES AND SAFETY SIGNS PER OSHA <br />EXIST VENT LINE <br />REQUIREMENTS. <br />1 BOOT <br />10. THE CONTRACTOR IS RESPONSIBLE FOR OVERALL CONSTRUCTION STE <br />CLEANLINESS, INCLUDING PROMSON OF A DEBRIS BOX WITH WEEKLY SERVICING, <br />1 FIBERGLASS REDUCER <br />REMOVAL OF ALL CONTRACTOR/SUBCONTRACTOR REFUSE AND DEBRIS. AND <br />SWEEPING OF THE ENTIRE YARD AREA AT THE COMPLETION OF THE WORK <br />11. UNLESS STATED OTHERWISE IN THE SCOPE OF WORK SUMMARY, AL OTHER <br />PROCEDURES, TESTING. MATERIALS AND EGLAPMENT SHOWN ON THE PLANS SHALL <br />SEAL AT PLATE CONNECTION <br />BE FURNISHED AND INSTALLED BY THE CONTRACTOR. <br />EXTRACTOR FITTING <br />12. DRAWINGS SHOULD NOT BE SCALED. N.T.S. INDICATES "NOT TO SCALE' AND THE <br />USTEO DIMENSION SHALL GOVERN. <br />13. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF DAMAGE TO THE <br />NOTES: <br />WOK OF OTHER TRADES CAUSED BY HIS OPERATIONS. THE NATURE SUCH <br />REPAIR WORK MUST RECEIVE THE PRIOR APPROVAL OF THE CHEVRON REP. <br />1. USE PHIL -PTE RISER SUPPORT BRACKETS (BRACELETS) <br />14. CONTRACTOR IS RESPONSIBLE TO SEE THAT THE WORK IN FIELD IS DONE IN <br />4" ALUMINUM FILL TUBE w/ <br />ACCORDANCE WITH FOLLOWING APPLICABLE NATIONAL. STATE AND LOCA. CODES. <br />POSITIVE SHUT OFT DEVICE: <br />INSTALL AT 95R OF TANK <br />ORDINANCES AND REQUIREMENTS BY GOVERNING AGENCIES. AS WELL AS ALL. <br />OTHER APPLICABLE CODES NOT LISTED HERE, WHETHER OR NOT SND CODES, <br />CAPACITY <br />ORDINANCES. REQUIREMENTS, ETC. ARE SPECIFICALLY SHOWN ON DRAWINGS <br />AND/OR CALLED FOR IN SPECIFICATIONS. ALL CODES ARE LISTED AS CURRENT <br />EDITION$ OR THOSE PRESENTLY IN USE BY GOVERNING AGENCIES. WHEN A <br />CONFLICT OCCURS BETWEEN SUCH LOCAL CODE AND INFORMATION SHOWN ON THE <br />SE <br />PLANS. PLANS. CONSULT CHEVRON REP. FOR RESOLUTION PRIOR TO COMMENCING WORK. <br />BUILDING -UNIFORM BUILDING CODE. <br />ELECTRICALTRIC CODE. <br />EC MECHANICAL UNIFORM MECHANICALCODE.CODE. <br />RLL/VAPOR DETAIL <br />PLUMBING -UNIFORM PLUMBING CODE. <br />FIRE -UNIFORM FIRE CODE. <br />" <br />KEY NOTE'S' <br />ACCESS -CALIFORNIA ADMINISTRATIVE CODE. TITLE 24. <br />HEALTH -CALIFORNIA HEALTH & SAFETY CODE. <br />HAZ. MATERIALS -LOCAL ENVIRONMENTAL HEALTH ANO/OR FIRE DEPARTMENT <br />DIVISION 13 - SPECIAL CONSTRUCTION <br />REQUIREMENTS (WHERE APPUCABLE). <br />-CALIFORNIA WATER RESOURCES BOARD REQUIREMENTS. <br />13.1 REPLACE FILL AND STAGE 1 VR SPILL CONTAINERS WITH NEW PML-TI7E 850DO <br />ALL FILL DROP TUBE, ADAPTER, CAP. <br />SPILL CONTAINERS. REPLACE/INSTALL <br />NR POLLUTION -LOCAL NR QUALITY MANAGEMENT DISTRICT. <br />-CALIFORNIA AIR RESOURCES BOARD REQUIREMENTS. <br />PER CARE APPROVED <br />AND VAPOR RECOVERY PER <br />AND <br />15. WHEN A CONFLICT CT OCCURS BETWEEN SUCH LORAL CUTE AND INFORMATION SHOWN <br />L FILL AND RN ID O <br />EQUIPMENT UST. INSTALL FILL AND VAPOR RETURN ID COLLARS. (TYPICAL AT Z <br />ON THE PLANS, CONSULT CHEVRON REP- FOR RESOLUTION PRIOR TO COMMENDING <br />TANK$). <br />WORK. <br />13.2 REPAR/REPLACE PIPING AND CONDUITS AS NECESSARY BY NEW WORK. <br />16. THE CONTRACTOR SHALL NOTIFY CHEVRON REP. F SITE CONDITIONS OR <br />REPAIR/PATCH CONCRETE AND A.C. PAVING AS NECESSARY. <br />DIMENSIONS DISAGREE WTH INFORMATION SHOWN ON THE DRAWINGS. WORK IS <br />NOT TO PROCEED UNTIL SUCH DIFFERENCES ARE RESOLVED. <br />13.3 EXISTING ELECTRICAL AND MONITORING PANELS (VERIFY IN FIELD). <br />13.4 (E) VENT RISERS TO BE MANFOLDED PER FlG 2F (PHL-T1TE) <br />SCOPE OF WORK <br />EO -VR -101. <br />REPLAN/INSTALL NEW PHASE I EQUIPMENT TO <br />MEET EVR COMPLIANCE <br />Chewon Products Company, a division of Chevron U.S.A. Ins.. owns the copy rights to the design of the h—in <br />descnbed "Eelro MR.' market budding as embodies b, any tangible or sh,d' x medium of espress induding o <br />bu0ding, archilwaturd plans, m drawings. the copyighled material Indudes the overall form as well as the a—g—t <br />and composition of spaces and elements in this 'Esta Mi." design. but doss not hclude individual standard features <br />or detads. Anyone wishes to copy, &It, ats, or s0 this MowMg many der' .U. works based hereon must haw <br />written permission of Chewon Products Clwnpmy. <br />e2001 Chevron Products Company, a dMIsow of Chewon US.A. Ina All rights reserved. <br />IL"/T ARCHITECTURE • ENGINEERING <br />SIL •ENVIRONMENTAL SERVICES <br />Owdf iHc M? K M90sea BLML PET= G Irm 185-1880 <br />NOM A Ae60K AIGNIIXT JWl4 K RAY. OW ENQMEO <br />I <br />755 S. TRACY BLVD. <br />TRACY, CA <br />SITE PLAN <br />SCALS AS NOTED <br />SS# 20-8117 <br />DATtr <br />JOB# CHV04009.1 <br />CH <br />SHEET <br />DR <br />SP1 <br />APP. <br />