Laserfiche WebLink
06/15/2004 11:45 120936543 TANKNOLOGY PAGE 09 <br />Monitoring System Certification <br />Site Address: 755 S. TRACY BLVD Date of Testing/Service: 03/24/2004 <br />0, Results of Testing/Servicing <br />Software Version Installed: 16,02 <br />complete the following checklist: <br />X Yes No" <br />Is the audible alarm operational? <br />Yes No" <br />Is the visual alarm operational? <br />® Yes No' <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />C�1 <br />Yes I-1 No <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br />interfere with their proper operation? <br />Yea No" <br />NIA <br />If alarms are relayed to a remote monitoring station, Is all communications equipment (e.g. modem) operational? <br />® Yes [:]No - <br />® NIA <br />For pressurized piping systems, does the turbine automatically shut down If the piping secondary containment <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive <br />shut -down? (check all that apply) ❑X Sump/Trench Sensors; ❑X Dispenser containment Sensors, <br />Did you confirm positive shutdown due to leaks aad sensor fallure/disconnection? (]X Yes QNo <br />Yes ®No" <br />Qx N!A <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanical <br />overfill prevention valve Is Installed), is the overfill warning alarm visible and audible at the tank fill points(s) and operating <br />properly? If so, at what percent of tank capacity does the alarm trigger?_ <br />Yea'No <br />Was any monitoring equipment replaced? If yes, Identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement arts In Section E, below. <br />Yes' No <br />Was liquid found inside any secondary containment systems designed as dry systems? (check ail that apply} ❑Product; <br />❑ Water, If yes, describe causes in Section E, below. <br />(� Yes ® No ° <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set-up reports, if applicable. <br />® Yes M No" <br />Fallmonitoring equipment operational per manufacturers' specifications? <br />" In Section E below, describe how and when these deficiences were or will be corrected. <br />E, Comments: <br />pege 2 of 3 <br />