Laserfiche WebLink
Date: 04/02/2003 <br />GDF Name and address: <br />Stage II system (check one): <br />Stage I type (check one): <br />Form 1 <br />Source Test Results <br />Static Leak Test <br />Time: 08:30 Application No. <br />208117 755 S. TRACY BLVD <br />Vapor Balance [ X ] Single Hose M.P.D. [ ] <br />Vacuum Assist [ l Type: <br />Two point [ X ] Manifolded? Yes [ X ] <br />Coaxial [ ] No [ ] <br />Tank # <br />1 <br />2 <br />Product grade <br />SUPER <br />REGULAR <br />Actual tank ca aci(gallons) <br />14976 <br />19703 <br />34679 <br />Gasoline volume (gallons) <br />4018 <br />9580 <br />13598 <br />Ullage (gallons) <br />10958 <br />10123 <br />21081 <br />Initial pressure of UST, inches H2O <br />0 <br />Number of nozzles served by tank <br />18 <br />18 <br />36 <br />Test location: (A) Stage I vapor <br />coupler of (B) Stage II riser <br />B <br />B <br />B <br />B <br />Initial Pressure, inches H2O (2.0) <br />2.00 <br />Pressure after 1 min. (inches H2O) <br />1.99 <br />Pressure after 2 min. (inches H2O) <br />1.98 <br />Pressure after 3 min. (inches H2O) <br />1.97 <br />Pressure after 4 min. (inches H2O) <br />1.96 <br />Final Pressure after 5 min. (inches <br />H2O) <br />1.95 <br />Allowable Final Pressure: Table IA, <br />Table 1B, Equations 9.1, 9.2 <br />1.92 <br />Test Status [Pass or Fail] <br />Pass <br />Tests Conducted By: HMCEVER <br />Test Company: TANKNOLOGY Date of Tests: 04/02/2003 <br />Tests Witnessed By: <br />G.ENS11- Rev 8/7/2002 Work Order #: 2225966 <br />