Laserfiche WebLink
onitoring System Certification <br />Site Address: 755 S. TRACY BLVD Date of Testing/Service: 04/30/2001 <br />F. In -Tank Gauging / SIR Equipment <br />Fj Check this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in tank gauging equipment is used to preform leak detection monitoring <br />Complete the following checklist: <br />11 Yes <br />® No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />E] Yes <br />® No * <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />El Yes <br />®No * <br />Was the accuracy of system product level readings tested? <br />Yes <br />®No * <br />Was accuracy of system water level readings tested? <br />Yes <br />®No' <br />Were all probes reinstalled properly? <br />Yes <br />®No * <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />G. Line Leak Detectors (LLD) : <br />Complete the following checklist: <br />n Check this box if no tank gauging or SIR equipment is installed. <br />® Yes <br />®No * <br />®N/A <br />or equipmentstart-up or annus equipmentcertification, was a ea simulatedo verify performance? <br />(Check all that apply) Simulated leak rate: ® 3 g.p.h E] 0.1 g.p.hE] 0.2 g.p.h <br />® Yes <br />® No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No <br />Was the testing apparatus properly calibrated? <br />® Yes <br />F-1 No <br />® N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Ej Yes <br />F-1 No <br />F-1 N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® Yes <br />F-1 No * <br />F] N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />Yes <br />n No * <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test . <br />® Yes <br />n No* <br />n N/A <br />or electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />®No * <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />fill and sump sensors were not inspected i will go back and re test them 2 fill 1 stp and atg <br />page <br />