My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 8:31:25 AM
Creation date
6/23/2020 6:58:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />• <br />WRITTEN MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Name <br />Facility Address, <br />A. Describe the frequency of performing the monitoring: _. T <br />TankTom---- <br />g. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank C ^ Av ov oi M a it � Y. jLgA �-- R,e�o c <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />��� A55't M(��- C,�J � ,►Jai thC.-e <br />E. Reporting format for monitoring: <br />Tank Lo+nso c <br />Piping e.o,n pVL c>- —r' <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: {� <br />necessary for the operation of UST system, including piping <br />G. Describe the training, <br />and the monitoring equipment: 20 y <br />
The URL can be used to link to this page
Your browser does not support the video tag.