Laserfiche WebLink
'NONITOR SYSTEM CERTIFIC ION <br />TANNOLOGY <br />Test Date: 05/04/2000 Work Order #: <br />2211958 <br />Client: CHEVRON, U.S.A. Site: CRyRON STATION <br />#208117 <br />P.O. BOX 6004 755 S. TRA CY BLVD <br />SAN RAMON. CA, 94583 TRACY, CA, 95376 <br />Overall System Operation <br />The pumps; Shut down automatically if the system detects a leak, fails to operate, or is <br />electronically disconnected. <br />( X ] Yes [ ] No <br />The system has functioningaudible and visual alarms. <br />(X ]Yes [ ] No <br />The circuit breaker for the system is properly identified. <br />[ X ] Yes ( ] No <br />The system is certified operational per manufacturer's performance standards. <br />[ X ] Yes [ ] No <br />Product Tank Monitoring: [ X ] Double wall [ l Single wall <br />Make: VEEDER-ROOT Model: LIQUID <br />Type: -ANNULAR SPACE LIQUID How many: 2 Operational: <br />(X ] Yes ( ] No <br />(Automatic tank gauge, annular space vapor probe, annular space liquid probe, hydroguard system, <br />vadose zone monitor well, groundwater monitor well) <br />Comments: <br />2 Automatic tank guages operational <br />Product Piping Monitoring: [ X ] Double wall ( ] Single wall <br />Make: VEEDER-ROOT Model: PLLD <br />Type: ELECTRONIC LINE How many: 2 Operational: <br />(X ] Yes ( ] No <br />(Piping sump liquid sensor, piping trench liquid sensor, electronic line pressure sensor, <br />mechanical line leak detector) <br />Comments: <br />2 Sump sensors operational, <br />Other Monitoring Systems: <br />Make: VEEDER-ROOT Model: LIQUID <br />Type: _SUMp I,IQUID SENSOR How many: 8 Operational: <br />( X ] Yes ( ] No <br />Comments: <br />2 Fill sump sensors operational, 6 Disp pan sensors operational. <br />Technician: MICHAEL T LEYESQUE Technician Signature: <br />