Laserfiche WebLink
I <br />INDIVIDUAL ' • ' • AND TEST RESULTS <br />Tanknology <br />•!! • ► !! <br />TEST DATE: 05/17/99 <br />AUSTIN, TEXAS 78757 (512) 451-6334 <br />WORK ORDER NUMBER: 2208696 <br />CLIENT: CHEVRON, U.S.A. <br />SITE: CHEVRON STATION #208117 <br />Tank ID: 87 1 <br />Tank manifolded: NO <br />Bottom to top fill in inches: <br />Product: REG UNLEAD <br />Vent manifolded: NO <br />Bottom to grade in inches: <br />Capacity in gallons: <br />Vapor recovery manifolded: YES <br />Fill pipe length in inches: <br />Diameter in inches: <br />Overfill protection: YES <br />Fill pipe diameter in inches: <br />Length in inches: <br />Overspill protection: YES <br />Stage I vapor recovery: DUAL <br />Material: DW FIBERG <br />Installed: ATG <br />Stage II vapor recovery: ASSIST <br />CP installed on: / / <br />COMMENTS <br />PSI at tank bottom: <br />Fluid level in inches: <br />UFT/OFT: <br />Fluid volume in gallons: <br />Tank water level in inches: <br />Test time: <br />Number of thermistors: <br />Specific gravity: <br />Water table depth in inches: <br />Determined by (method): <br />Leak rate in gph: <br />Result: <br />COMMENTS <br />Test time: <br />Ullage volume: <br />Ullage pressure: <br />Results: <br />New/passed Failed/replaced New/passed Failed/replaced <br />L.D. #1 L.D. #1 L.D. #2 L.D. #2 <br />Make: VEEDERROOT <br />Model L.L.D. <br />S/N: <br />NOT Open time in sec: <br />TESTED Holding psi: NOT <br />Resiliency cc: TESTED <br />Test leak rate mVm: 189.0 <br />Metering psi: <br />Calib. leak in gph: 3.00 <br />Results: PASS <br />COMMENTS <br />DATA FOR UTS-4T ONLY: <br />Time of test 1: <br />Temperature: NOT <br />Flow rate (cfh): TESTED <br />Time of test 2: <br />Temperature: <br />Flow rate (cfh): <br />Time of test 3: <br />Temperature: <br />Flow rate (cfh): <br />COMMENTS <br />Material: <br />Diameter (in): <br />Length (ft): <br />Test psi: <br />Bleedback cc: <br />Test time (min): <br />Test 1: Start time: <br />Finish psi: <br />Vol change cc: <br />Test 2: Start time: <br />Finish psi: <br />Vol change cc: <br />Test 3: Start time: <br />Finish psi: <br />Vol change cc: <br />Final gph: <br />Result: <br />Pump type: <br />Pump make: <br />COMMENTS <br />DW FIBERG <br />2.0 <br />200.0 <br />NOT NOT NOT NOT <br />TESTED TESTED TESTED TESTED <br />PRESSURE <br />FE PETRO <br />Impact Valves Operational: UMMOWN <br />Draft 06/02/1999 15:34 MSHAW <br />