Laserfiche WebLink
7-30-1998 2.32PM FROM P_6 <br />4ST SYSTEM DRAWINCx INFORMATION <br />1. Three complete sets of plans Cinclude manufacturer's specification sheets for proposed equipment to be installed). <br />2. Plans drawn to scale in non -erasable print. <br />3. Plot pian to show, location of tanks and all associated piping, <br />4. Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings - <br />5. �, Tank cross-sectional diagram. <br />6. Detail of tank, associated piping, excavation and cover. <br />7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br />Article 3, Section 2631 (b) & 26351 <br />8. Verification of product compatibility with the tank(s), piping, monitoring <br />,r device(s), epoxy or silicone glues, etc. <br />9. ✓ Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. "� At the installation site, prior to installation, a tightness test shall be performed an both primary (1°) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />11. f:�L Tank integrity test required upon completion of installation with tank in operating condition, Test results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />17 TaYY F1WDACTTTnY <br />TANK # <br />tt / <br /># <br /># <br /># <br /># <br />CAPACITY <br />676`0 <br />trp, 000 <br />MANUFACTURER <br />XZRX5 S <br />y erx l <br />COMPOSITION <br />MODEL <br />ii <br />PRODUCT I 40 <br />/ <br />CORROSION PROTECTION <br />U.L. LISTED <br />L <br />o <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO BE IlMrALLEO <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings - <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />% (2) vacuum applied to interstitial space. <br />8. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation - <br />(2) vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test) - <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)I <br />_ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.)_ <br />_ (2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />L, <br />