Laserfiche WebLink
7-30-1998 2:34PM FROM P.10 <br />- E11 UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME: Ct(EVRonI ADDRESS: *eA Cf LY <br />FACILITY IDA TANK# vkv-lJ ULN TANK MODEL/MATERIAL: x regx e S <br />CAPACITY:D0U 5 ) p 0 PRODUCT: LlC R.E.H_S: <br />INITIAL INSPECTIONS <br />A <br />I <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />4. PRIMARY TANK TEST: PSI: NRS/MIN: <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />5. TANK APPROPRIATELY PLACED KITH APPROVED BACKFILL (API/PEI) <br />R <br />T <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br />0 <br />I <br />10_ OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br />V <br />A <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br />I <br />E <br />L <br />12- PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (0(1)) <br />1 <br />D <br />S <br />20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: NRS/MIN: OTHER: (CCR 2636 Ce)) JI <br />4. PRIMARY TANK TEST: PSI: NRS/MIN: <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM)- HRS: (CCR 2635 (a) (4)) <br />5. TANK APPROPRIATELY PLACED KITH APPROVED BACKFILL (API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2636 (e)) <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: NRS/MIN: OTHER: (CCR 2636 Ce)) JI <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM)- HRS: (CCR 2635 (a) (4)) <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br />10_ OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br />I <br />12- PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (0(1)) <br />FINAL INSPECTION <br />COMMENTS.-- <br />EH23-006 9/95 <br />m <br />13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br />14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 Cc) (2)) <br />15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 (c) (1)) <br />16. PERFORMANCE TEST Of AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br />17. BALL FLOAT VALVES INSTALLED <br />18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br />19. TANK ACCESS PORTS BROUGHT TO GRADE CLOCKED AND WATERTIGHT) RPI f <br />1 <br />20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br />21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br />22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />23_ MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br />24. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H -S CODE 25284) <br />COMMENTS.-- <br />EH23-006 9/95 <br />m <br />