Laserfiche WebLink
w <br /> itoring System Certification <br /> Site Address 755 S.TRACY BLVD Date of Testing/Service: 03/06/2009 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Complete the following checklist: <br /> El Yes No* Is the audible alarm operational? <br /> ❑X Yes F-]No• Is the visual alarm operational? <br /> ❑X Yes No• Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not Q Yes ❑No` interfere with their proper operation? <br /> Yes No* x N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> Mx Yes E]No* N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑x Sump/Trench Sensors; ❑x Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks ansa sensor failure/disconnection? ❑x Yes No <br /> ED Yes ❑No` E]N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? 90 Bio <br /> Mx Yes` ❑No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes` ❑x No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> ❑ Water. If yes,describe causes in Section E,below. <br /> Ox Yes ❑No• Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> ® Yes ❑x No° Is all monitoring equipment operational per manufacturers'specifications? <br /> *In section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> 1 yr pild on 87 turbine.Still failed test though <br /> Page 2 of 3 Based on CA form dated 03101 <br />