My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:06:08 AM
Creation date
6/23/2020 6:58:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2014-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Monitoring Certification Checklist <br /> Store Number: 98264 Address: 3775 N.TRACY BLVD TRACY,CA 95376 <br /> Date:2/9/2016 Technician: Todd Inderbitzen Company:TANKNOLOGY INC. <br /> Step Instruction Tank 1-SUPREME Tank 2-PLUS Tank 3-REGULAR <br /> Product SUPREME PLUS REGULAR <br /> Tank Type Fiberglass Fiberglass Fiberglass <br /> (DW FRP,DW Steel,SW FRP) <br /> 1 Annular Riser Height(measured) <br /> 2 Tank Diameter 0.00 in. 0.00 in. 0.00 in. <br /> For FRP tanks,1/2 circumference of the tank <br /> 3 0.00 in. 0.00 in. 0.00 in. <br /> (see Note 1 below) <br /> Required annular sensor length: <br /> 4 FRP=Riser+1/2 Circumference=step 1+step 3 0.00 in. 0.00 in. 0.00 in. <br /> Steel=Riser+diameter=step 1+step 2 <br /> Mark&label the required sensor length on sensor cord. <br /> 5 Label should be under the cap&serve to prevent the cord <br /> being pulled too short. <br /> 6 FRP Tanks:Is the sensor installed with the marked required <br /> length lining up with the top of the annular riser? <br /> 7 Steel Tanks:Is the sensor toughing bottom with slack <br /> above the marked required sensor length? <br /> Are the DW pipe boots pulled back in tank sumps? <br /> 8 (YIN or N/A,note if can't be verified because clamshell Yes Yes Yes <br /> pointing down <br /> Are tank sump sensors back in their holders and in the <br /> 9 correct position? Yes Yes Yes <br /> (YIN or N/A document with photo) <br /> Has the Veeder Root Battery been replaced&dated prior to failsafe? <br /> (If battery backup failed,label and leave failed battery on top of console,note in comments and advise your OM) See Comment <br /> Has Veeder Root Programming before&after testing been printed&verified? Yes <br /> (especially tank manifolding setup-see Note 2) <br /> Has Veeder Root Programming before&after been attached to the Work Order? Yes <br /> Have all sensor model numbers been verified against the Veeder Root cord label? Yes <br /> Make a note if sensor label missing or illegible,&approx.cord length for-208/-209 with missing labels <br /> Additional Comments: <br /> batt vltg 3.7 <br /> Note 1: DW FRP Tank Circumference Note 2: Certain Veeder Root Software versions will automatically revert to the default <br /> tank manifold settings any time the programming is changed,such as when sensors are <br /> 1/2 Circum= (3.14 x tank diam) temporarily X'ed out,etc <br /> 2 <br /> SO'diameter 1/2 Circum=188" <br /> 8'diameter 1/2 Circum=151" <br /> 6'diameter 1/2 Circum=113" <br />
The URL can be used to link to this page
Your browser does not support the video tag.