My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:09:31 AM
Creation date
6/23/2020 6:58:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />Overfill Prevention <br />From the company that brought you the <br />the standard with the introduction of the <br />Now 7180 Overfill Prevention Valve — <br />41re- AWWWli- <br />prevention to a whole new level of <br />mzm=� <br />o Easier, quicker, installation <br />lA7iT�7MAj6f@ I - <br />shut-off valve, providing completely <br />sets. aT'l-in ove <br />the tank can be filled to a maximum <br />.MaciN of 98%. The 71 SO is available <br />E <br />the -Qualltv <br />,, and reliabitf of the installation is si,!n <br />the elimination of curing hassles during challenging applications, such as <br />extreme temperature conditions. No delays, no mess. EVR compliance is <br />2ssured with no time-consuming, expensive return visits to re -epoxy the valve, <br />NOE <br />THEN 7150 ELIMINATES <br />THE MESS AND CURING <br />HASSLES OF EPDXY SEALANTS <br />THE NEW NO EPDXY 71 SO <br />PROVIDES FOR AN EASIER, <br />HIGHER QUALITY AND MORE <br />REUABLE INSTALLATION <br />California Air Resources Board <br />Phase I Vapor Recovery System <br />CarIkallon (VR.102.H) <br />p 2, <br />0 The Only Vapor-T�ht Overfill Volvo In The Industry That Does Not <br />Require Mossy, Time -Consuming Epoxy Sealants 'HEAJH <br />N "0 eA <br />0 Robust PatentPatent-Pending Design <br />• Reduces installation time and costs <br />• Improves quality of installation <br />* Special Patented And Paterd-Pending Design FeaWres Enable <br />Improved EVR Compliance By Eliminating 10 Of 17 Potential Leak Paths <br />- Typical valves have 17-25 potential leak paths <br />- Higher level of protection against fugitive emissions and pressure decay <br />- Improves EVR compliance assurance by 60% <br />- Reduces/eliminates future maintenance and/or valve replacement costs <br />
The URL can be used to link to this page
Your browser does not support the video tag.