My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:09:31 AM
Creation date
6/23/2020 6:58:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREVENTATIVE MAINTENANCE <br />Annually, inspect the flapper in the 7150 to see that it is <br />open by looking down the drop tube opening. Test the <br />71 SO drop tube seals with CARB procedure TP -201.1 D. <br />If the drop tube seal passes testing, no further mainte- <br />nance is required. If the drop tube fails testing, replace <br />the drop tube seal with OPW P/N: 1-111931 M for 4" <br />Tubes. Re -test the 71 SO drop tube with CARB proce- <br />d TP -201 1 D The lower tube o-rin seal DPW PIN: <br />cations. Performance Requirement: Leak rate to be less <br />than or equal to 0.17 CFH@2.0" W.C. <br />Torque Specification <br />Taptite Screws, #10-24 thread cutting, 20 in -lbs mini- <br />mum to 35 in -lbs maximum. Testable Models Only: <br />Socket Adaptor, 1/4" NPT, 3.5 ft -lbs (42 in -lbs) minimum <br />to 5.0 ft -lbs (60 in -lbs) maximum. <br />ure g <br />H14840M can also be replaced. If this does not correct IMPORTANT: Leave these installation instructions <br />the leak the 7150 needs to be replaced. and maintenance procedures with the station opera- <br />tor. <br />FOR TESTABLE MODELS ONLY: The socket adaptor <br />can be removed and poppet and float movement and <br />function inspected without removing the valve. See <br />Page 17 for full testing details. If replacement parts are <br />needed for testable models the following items are <br />available: OPW P/N 206741 Testable Inlet Tube S/A, <br />206740 Socket Adaptor and Cable Assembly, and 61 SOK <br />-0001 Float Kit. <br />CAUTION: Do not insert any foreign object into drop <br />tube if flapper is in the closed position. For exam- <br />ple, a tank level measuring stick. This will damage <br />the valve and void the Warranty. ALWAYS check <br />flapper location before "sticking" the tank. If flap- <br />per is in the closed position, the tank is either over- <br />filled and you need to wait until the liquid level goes <br />down or the 7150 is damaged and needs to be re - <br />7150 Performance Specifications <br />This Overfill Prevention Valve has been manufactured <br />and tested to, and met, the following California specifi- <br />Appendix A <br />71 SO Overfill Valve Upper Tube Calculation Worksheet <br />Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br />manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br />tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br />shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br />Desired tank capacity for shut-off: SO%=15, <br />Dipstick Number on Tank Chart that corresponds to 100% volume (Y) _ 1�,r�--,��,m <br />Dipstick Number on Tank Chart that corresponds to SO% (X) _ — I�L� (X) <br />Upper Tube Reference NumberZ=Y-X + I (Z) <br />Upper Tube Depth Inside Tank C = Z-2" 2 <br />Distance from top sealing surface for 71 SO Lip' to inside the OZP (C) <br />top of Storage Tan k2 A= 1p�r <br />For Non -Testable 71 SO models only <br />In all cases for non -testable 71 SO models, the top of the valve body must protrude at least 61/2" into the tank to <br />provide a minimal clearance for proper operation? Additionally the total Upper Tube Length m e V4east <br />of length to include the protective bend in the tube. <br />Is C less than 61/2" Yes /0 <br />If NO, Upper Tube Length (D)= C + A <br />If YES, Upper Tube Length (D)= 61/2 "+ A <br />Upper Tube Length <br />For Testable 71 SO models only <br />In all cases for Testable 7150 models, the top of the valve body must protrude at least 61/2" into the tank to provide <br />a minimal clearance for proper operation.3 Additionally the total Upper Tube Length must be at least 141/2" of <br />length to include the protective bend in the tube. <br />Is C less than 5" Yes / No <br />If NO, Upper Tube Length (D)= C + A -1 1/2 " <br />If YES, Upper Tube Length (D) = 61h" + A - 1 1/2 <br />Upper Tube Length = <br />Sealing surface maybe the top of the Face Seal Adaptor, the built in sealing ledge inside some spill containers, or on non -vapor <br />tight applications the top of the pipe nipple <br />2 Some Underground Storage tanks utilize manway system at the top. Make sure to use the top of the storage tank formeasure- <br />mentandnottotopofthemanway. Consultyour underground tank manufacturer for height ofthe manway <br />' This measurement is taken from the seam where the upper tube is attached to the valve body to the inside ofthe tank top. <br />18 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.