My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_1986-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 3:50:43 PM
Creation date
6/23/2020 6:58:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2008
RECORD_ID
PR0508452
PE
2361
FACILITY_ID
FA0007787
FACILITY_NAME
PACIFIC CAR WASH/MARKETPLACE INC
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508452_4405 PACIFIC_1986-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. a. Describe the method that will be utilized to purge and/or inert the # <br /> ?ns£ar A mia;mvm r•, ice. pfa Pvdr 7 I Oo� ojol)onrS <br /> vol <br /> b. Tank/Piping Hauler. �^ <br /> Name W F s 0-04,1 s i eA <br /> Address E o o :I`�[l Q k Gzw c? City -7Z f/or-K Zip <br /> Phone No Z,�� J 6 0 /378" <br /> Hauler Registration#Of hauled as hazardous)—C&-7/--21.5/-- <br /> C. <br /> azardous) C,9 7/�3/— <br /> c. Tank/Piping Disposal Site: <br /> Name We <br /> 7 �aV►AM.Pn-T <br /> Address 90' <br /> /4`r I DA CA v r T '—City- -C/0 2p- 95 � <br /> Phone NQ 2.Q r_J (6 $ — 93 7f <br /> EPA IDR Of transported to a permitted TSD facility)ff/1h <br /> 9. Is the sampling firm an independent third party from the contractor? YESV NO t1 <br /> 9a. Describe,in detail,how the soil andior water sample(s)beneath the tank and piping\\will be pbtalned: <br /> F a win d' a h whtji d( t4 <br /> To S '-r € c — 'l col PC <br /> 6rG514P ve5 c�d .S•};� Fro cit Ps . <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> -1/6// JCA - (;rovtI will be Siri ANDy7,'liz�d <br /> BActCF;�I � — <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> 1 in 'c, <br /> b)What will be the final destination of the excavated stockpile? <br /> WASTE <br /> }�Av�FD o •SiT� 4-® eiTaca FAruARo �nc. 1440);V oQ bF-, S, <br /> c)Contaminated Soil Hazardous Waste Hauler <br /> Name Jim T,44 Rf,& ®� ' �f1C . Hauler Re tion 0 b b� <br /> Address P. D. eizx S5 -7 City i®o ZIP '/ Zy <br /> Phone No.( 2 O ! 1 5b l— b175 <br /> EH 23 046(Revised 10119198) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.