Laserfiche WebLink
12 November 1998 <br /> AGE-NC Project No. 96-0229 <br /> Page 3 of 7 <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT <br /> Based on evaluation of potential hazards, the following levels of personal protection have been <br /> designated for the applicable work areas or task: <br /> LClCATON: JOB FUNCTION: LEVELS MJF PROTECTION: <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized,organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations.No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies)consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Gary Dickenson Collect soil and/or samples; direct probing <br /> FIELD CREW: TASK: <br /> Geo Probe Operator Advance borings <br /> Field Technician(if nec.) [Clean equipment <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> Advanced GeoEnvironmental,Inc. <br />