Laserfiche WebLink
SWRCB, January 2002 <br />Page of <br />Test Method Developed By: <br />X Piping Manufacturer ❑ Industry Standard 1; Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Sped) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run # 5 <br />Piping Run # 6 <br />Piping Run # 7 <br />Piping Run # 8 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />4" <br />4" x 3" <br />Length of Piping Run: <br />Approx. 35' <br />Approx. 175' <br />Approx. 18' <br />Approx. 175' <br />Product Stored: <br />Super 91 <br />Super 91 <br />Gasoline Vapor <br />Gasoline Vapor <br />Method and location of <br />piping -run isolation: <br />Test boot at STP <br />Piping Sum #2 <br />Test boot at <br />UDC #3&4 <br />Test boot at STP <br />Piping Sump#1 <br />Test boot at <br />UDC #3&4 <br />Wait time between applying <br />pressure and starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />9:25 <br />11:05 <br />9:15 <br />10:55 <br />Initial Reading (R,): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />10:25 <br />12:05 <br />10:15 <br />11:55 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail ` <br />X Pass - ❑ Fail <br />X Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />