Laserfiche WebLink
SWRCB, January 2002 Page of <br />11 _ SPTT.T./OVF.RFTT,T. CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ILI <br />Spill/Overfill Containment Boxes are Present, but were Not Tested X <br />Test Method Developed By: 7 Spill Bucket Manufacturer ❑ Industry Standard Professional Engineer <br />Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />11 Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # Spill Box # <br />Spill Box # <br />Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑; Pass ❑Fail ❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Spill/Overfill Boxes Tested with Annual Monitoring System Certification. <br />