Laserfiche WebLink
E <br />E <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [31 NO [ ] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Replace the 87/91 (split tank) annular sensor. <br />Replace the 87 product relay and retest all dispenser sump sensors <br />and the 87 product turbine sump sensor. <br />Site was cold started during inspection. Replaced the ECPU2 board. <br />Retested with inspector present. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -parry approval): <br />Veeder-Root 420 annular sensor 794390-420 <br />FE Petro FFS 120V Relay #400215931 <br />Veeder - Root EPCU board 331500-358 V330.01B software <br />2 <br />