My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 4:04:02 PM
Creation date
6/23/2020 6:58:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0508452
PE
2361
FACILITY_ID
FA0007787
FACILITY_NAME
PACIFIC CAR WASH/MARKETPLACE INC
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508452_4405 PACIFIC_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Replacing the ECPU Board lnstaping the ECPU Board <br />Ci <br />Rest bottom of tool on <br />socket Rush down wit <br />thumb to hold toot an <br />socket <br />4 Continuing to apply <br />pressure with fingers. <br />gently lift the tool <br />straight up until the <br />chip pins are clear <br />of the socket <br />xuinue to pun up <br />at fingers until <br />1p Is lifted up <br />sinst bottom <br />tool. <br />Figure 4. Removing the EEPROM Chip from the ECPU Board <br />--jj ------L----- U -----!a.--. <br />---1,7Tthm'MnTnm M MI'T nM 'MM '�J u' <br />------------ <br />U13 i----! Notch w <br />� I <br />(Painted <br />r r on board) <br />17 <br />indented f <br />r <br />U32 F - <br />1 <br />i <br />1 <br />1 <br />, <br />samlt3rct9 r :, <br />(Onch!p) ---- <br />t r <br />U12 t <br />, I <br />r <br />-_--� Y2 <br />Check to see that chip pins are aligned and not bent. Orient clip so that the small <br />indented semicircle on the top of the chip is on the same end as the small notch painted <br />on the board above the socket (in this <br />example on the top) . Carefully align the chip pins over the socket how and gently push <br />the cls down until all the pins are in the socket holes. Then putt dawn frallyy and evenly <br />on the chip lentil it is down against the socket. Check to see that each of the pins is in is <br />socket. <br />Figure S. Orienting E2 Chip <br />InSWUng the ECPU Bomrd <br />1. install the new ECPU board in the console following the steps outlined in Figure 6. <br />i <br />, <br />, <br />i <br />U33 <br />It <br />ommommom If <br />gt <br />2 Pull up wtth fingers on <br />( <br />slides to close lifting <br />Ufting clamps <br />clamps against ends <br />of Int chip and lifting <br />Willing hooks <br />7 d <br />hooks under ends <br />of chip <br />4 Continuing to apply <br />pressure with fingers. <br />gently lift the tool <br />straight up until the <br />chip pins are clear <br />of the socket <br />xuinue to pun up <br />at fingers until <br />1p Is lifted up <br />sinst bottom <br />tool. <br />Figure 4. Removing the EEPROM Chip from the ECPU Board <br />--jj ------L----- U -----!a.--. <br />---1,7Tthm'MnTnm M MI'T nM 'MM '�J u' <br />------------ <br />U13 i----! Notch w <br />� I <br />(Painted <br />r r on board) <br />17 <br />indented f <br />r <br />U32 F - <br />1 <br />i <br />1 <br />1 <br />, <br />samlt3rct9 r :, <br />(Onch!p) ---- <br />t r <br />U12 t <br />, I <br />r <br />-_--� Y2 <br />Check to see that chip pins are aligned and not bent. Orient clip so that the small <br />indented semicircle on the top of the chip is on the same end as the small notch painted <br />on the board above the socket (in this <br />example on the top) . Carefully align the chip pins over the socket how and gently push <br />the cls down until all the pins are in the socket holes. Then putt dawn frallyy and evenly <br />on the chip lentil it is down against the socket. Check to see that each of the pins is in is <br />socket. <br />Figure S. Orienting E2 Chip <br />InSWUng the ECPU Bomrd <br />1. install the new ECPU board in the console following the steps outlined in Figure 6. <br />i <br />, <br />, <br />i <br />U33 <br />It <br />ommommom If <br />
The URL can be used to link to this page
Your browser does not support the video tag.