Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name: PACIFIC CAR WASH I Date of Testing: 5/15/2018 <br /> Facility Address: 4405 PACIFIC AVENUE STOCKTON , CA 95207 <br /> Facility Contact: TAMMI Phone: <br /> Date Local Agency Was Notified of Testing:4/24/2017 <br /> Name of Local Agency Inspector(if present during testing): AARON <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 2na Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑Ed Stearns ® Zane A.Nimmo ❑ David A.Winkler ❑ Felix G.Ramirez <br /> 8883080—UT 8883064-UT 8883059-UT 8883072-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ®Hydrostatic ❑ Vacuum ❑ Other <br /> Test Equipment Used: TAPE MEASURE, H2O Equipment Resolution: 1/16" <br /> ,: . . m . ,�rsm ,.wxli � ».� v �: � <br /> Identify Spill Bucket (By Tank 1 87 2 3 91 4 <br /> Number, Stored Product, etc. <br /> ®Direct Bury ❑Direct Bury ®Direct Bury ❑Direct Bury <br /> Bucket Installation Type: F-1 Contained in El Contained in <br /> El Contained in Sump El Contained in Sump Sump Sum <br /> Bucket Diameter: 11 11 <br /> Bucket Depth: 14 5/8 15 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 0953 0953 <br /> Initial Reading(Ri): 13 5/8 14 - <br /> Test End Time(TF): 1053 1053 <br /> Final Reading(RF): 13 5/8 14 - <br /> Test Duration(TF—TI): HOUR HR <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ® Pass ❑Fair ❑ Pass ❑Fail ® Pass ❑Fail ❑ Pass El Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ALL MEASURED 5 GALLONS PLUS <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date: 5/15/2018 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />