My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 4:04:02 PM
Creation date
6/23/2020 6:58:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0508452
PE
2361
FACILITY_ID
FA0007787
FACILITY_NAME
PACIFIC CAR WASH/MARKETPLACE INC
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508452_4405 PACIFIC_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />6. SECONDARY PIPE TESTING AUG 2 2 H I S <br />Test Method Developed By: X Piping Manufacturer _ Industry Standard ❑ Professional Engineer <br />❑ Other (Specie) 1t. <br />Test Method Used: X Pressure ❑ Vacuum I Hydrostatic <br />❑ Other (Specie) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run # 5 <br />Piping Run # 6 <br />Piping Run # 7 <br />Piping Run # 8 <br />Piping Material: Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: 3" <br />3" <br />4" <br />4" x 3" <br />Length of Piping Run: Approx. 35' <br />Approx. 175' <br />Approx. 18' <br />Approx. 175' <br />Product Stored: Super 91 <br />Super 91 <br />Gasoline Vapor <br />Gasoline Vapor <br />Method and location of Test boot at STP <br />piping -run isolation: Piping Sum #2 <br />Test boot at <br />UDC #3&4 <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at <br />UDC #3&4 <br />Wait time between applying 15 Minutes <br />pressure and starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: 8:30 <br />8:35 <br />8:40 <br />8:45 <br />Initial Reading (Ri): 5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: 9:30 <br />9:35 <br />9:40 <br />9:45 <br />Final Reading (RF): 5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: 1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): 0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or No loss in Psi <br />Criteria: <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />Test Result: Pass <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.