My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
322
>
2300 - Underground Storage Tank Program
>
PR0516472
>
COMPLIANCE INFO_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 12:51:43 PM
Creation date
6/23/2020 6:58:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2013
RECORD_ID
PR0516472
PE
2361
FACILITY_ID
FA0012628
FACILITY_NAME
UNITED #5449
STREET_NUMBER
322
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14906111
CURRENT_STATUS
01
SITE_LOCATION
322 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516472_322 S CENTER_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />UNDERGROUND STORAGE TANK low <br />RESPONSE PLAN - PAGE 1 s; 104: farm eifeili <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION ; 1101. <br />e gd <br />I. #ACIT;ITY INFORMATION <br />FACILITY ID9 (Agency Use Only) <br />x� <br />t. <br />BUSINESS NAME (Same as FACILITY NAME) 3 <br />CRLLC # 5448 "- <br />BUSINESS SITE ADDRESS 103' <br />BUSINESS.SITEITY C 104. <br />322 S. Center f%W <br />1 <br />Stockton <br />II 9PH CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan (HMBP). <br />➢ If safe to do so, facility personnel will take immediate measures to control or stop any rele ase (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />Any release to secondary containment will be pumped or otherwise removed within a ti me consistent with the ability of the s econdary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non -hazardous. Used abs orbent material, reusable or waste, will be stored in a properly labeled and seal ed container. Waste material shall be disposed of <br />appropriately. <br />➢ Facility personnel will dete rmine whether any water removed from secondary containment systems, or from clean-up activity, has been in co ntact with any <br />hazardous material. If the wate r is contaminated, it will be managed as hazardous waste unless a hazardous waste determ ination in accordance with 22 CC R <br />§66262.11 finds that it is non -hazardous. If th a water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A th ick floating petroleum layer may not <br />necessarily display rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not be disposed to storm water systems. <br />➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br />3. Hazardous material, other than the p roduct/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />=SPILL CONTROL. AND GLEAN -UP EQUIPMENT <br />�. <br />PERIODIC MAINTENANCE: Spill control and clean-up equipm ent kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. T his <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete ly i a licable <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />RIO. <br />R20, <br />R30. <br />Absorbanl Material <br />Back Room <br />24 hrs <br />RI 1. <br />R21. <br />R31. <br />R12. <br />R22. <br />R32. <br />R13. <br />R23. <br />R33. <br />R14. <br />R24. <br />R34. <br />R15. <br />R25. <br />R35. <br />IV. , RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />NAME R40. <br />TITLE R50. <br />Allen Faass <br />Complinace <br />NAME R41. <br />TITLE 1151• <br />Rob Howard <br />Maintenace and Compliance <br />NAME R42. <br />TITLE R52. <br />NAME R43. <br />TITLE R53. <br />V. MONITORING INDICATORS , <br />IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />❑ 1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ® 2. INSPECTION BY QUALIFIED PERSONS ❑ 3. RECALIBRATION OF EQUIPMENT Rho. <br />[199. OTHER (Specify): R61. <br />UN -022B www.unidocs.org 1/3 - Rev. 12/14/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.