Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />RESPONSE PLAN - PAGE I (One form per facility) <br />TYPE OF ACTION 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION Rol. <br />FACILITY -INFORMATION -�- - - - - -- <br />FACILITY ID # (Agency Only) t <br />BUSINESS NAME (Same as FACILITY NAME) R02. <br />Stockton Gas #GSEP <br />BUSINESS SITE ADDRESS R03, <br />CITY R04. <br />322 South Center Street <br />Stockton <br />II.: SPILL CONTROL AND CLEANUP METHODS <br />- SPILLCONTROL <br />plan addresses unaudwrized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan. <br />➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />➢ Any release to seconday containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous inaterial, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non -hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br />appropriately. <br />➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds <br />that it is non -hazardous If the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick floating petroleum layer may not necessarily display <br />rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not be disposed to storm water systems. <br />➢ We will review secondwy containment systems for possible deterioration if any of the following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary contairAent is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />' IIL .SPILUCONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />RIO. <br />R20. <br />R30. <br />R11. <br />R21. <br />R31. <br />R12. <br />R22. <br />R32. <br />R13. <br />R23. <br />R33. <br />R14. <br />R24, <br />R34. <br />RI5. <br />R25. <br />R35 <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />NAME R40 <br />TITLE R50. <br />Gurdeep Singh <br />President <br />NAME R41. <br />TITLE R51- <br />Amar'it <br />Secretary <br />NAME R42. <br />TITLE R52. <br />NAME R43. <br />TITLE R53. <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />❑ Additional system testing or data collection ® Inspection by qualified persons ❑ Recalibration of equipment <br />Other: <br />R60. <br />UST Response Plan (3/2 3/3 <br />