Laserfiche WebLink
e <br /> â–ºTanknc*W IRK <br /> 8501 N MOPAC EXPRESSWAY,SUITE 400 <br /> AUSTIN,TEXAS 78759 <br /> (512)451-6334 <br /> FAX(512)459-1459 <br /> TEST DATE:07/09/08 WORK ORDER NUMBER2258176 <br /> CLIENT:FLYING "J" INC SITE:FLYING "J" 0500079 <br /> COMMENTS <br /> 18 secondary line runs, 5 stp sumps, 2 piping sumps, 34 disp, all diesel side lines failed! <br /> transition sump 1 line, 1 north, 1 east, and 1 west. . . transition sump 2 lines, 1,2,3 west, 1, 2 <br /> north, 1 south 1 east. . big flow fiberglass lines in diesel stp sumps 1, 2, 3 failed. reg line <br /> failed, disp 16/17 failed. transition sump 2 was unable to be tested due to volume <br /> PARTS REPLACED <br /> HELIUM PINPOINT TEST RESULTS (IF APPLICABLE) <br /> OEM, <br /> Printed 08/26/2008 08:56 ACRAMER <br />