Laserfiche WebLink
1 2 3 4 6 6 7 8 9 to n 12 73 14 M 1e 17 Is <br /> M <br /> M <br /> VRM System Specification �173ta1 IatlOn 8t$t2lf#Up There are several different wiring schemes that may be encountered when connecting the AC Input Module and Relay <br /> +'ar Refer to the Executive Order 202,Exhibit 2,for the most up to date system specifications, The required equipment to be Module.These are dependent upon the use of optional features like Dispenser Hook isolation,Line Leak Detection(LLD) <br /> e • L installed for the INCON VRM system is discussed below. Figure 1 shows the different components and where they attach TS-550/5000/EMS Console Installation and Turbine Pump Interface that can affect the way these modules are wired. The description below assumes that this <br /> to the Console.All items in bold are items directly related to the VRM application. The console will be shipped with all modules installed and tested. Refer to the TS-Sxxx Installation Guido(p/n 000-2150) is strictly a VRM system that is sensing the dispenser hook signals from gasoline products only and not controlling the L <br /> for mounting and wiring instructions. Submersible Turbine Pumps. For more information on the different wiring options see the TS-5XXX Installation Guide(pin <br /> r 000-2150)or contact Franklin Fueling Systems Technical Support at 1-800-984.6266. <br /> controller Modula(CM) <br /> r Power <br /> s <br /> u <br /> p <br /> ply <br /> (PSM) Dispenser Hook Signals <br /> Isolason server The dispenser hook signals are sampled by the AC Input Module <br /> 8' so that the VRM can monitor the start and end of <br /> e a Y g 1a1LO gasoline sales <br /> gF a� $ / t � a!C o e u o / ° transactions, Follow the instructions below to lap into the Dispenser <br /> K <br /> Figure ei <br /> t Hook Signals with a parallel wire to the AC Input Module.This method <br /> i s II ,i .. �, will not lake control of the Submersible Pumps, K <br /> 1. Locate the gasoline product only dispenser hook signals at a <br /> point where they are still separated by dispenses This maybe ll <br /> dispenser hook Isolation box or other method or they may just all be <br /> 1 connected with a wire nut. <br /> t o <br /> ' j ' q ��°^^-'•^�^•'� 2.Separate them by dispenser number then by fueling grade. <br /> Iso411 <br /> smlw.r ( M°dull.(rd is Modutea(lotus) , „• o 3.Conned a wire in parallel from the line and neutral of each <br /> `a <br /> s :ry dispenser hook signal to the AC Input Module.All existing wiring J <br /> o <br /> sc� ( T&5000(trout view Wth awmremoved) o should remain as is. <br /> 4.When wiring the Dispenser Hook signals to the AC Input Module, <br /> or <br /> o " ^ make dispenser 1 signals all gasoline grades)lo° to P 9 ( 9 9r )go to the first set <br /> om+r+ <br /> TS-VFM Installation �° fo g«^-•-w� of terminals. For example,if there are two hooks per dispenser <br /> �° jo (Regular and Super)then wire Dispenser 1 to positions 1&2,then <br /> ae m m ad. i'roM aaa•a Field Installation - oP.—Sopor W' P y Dispenser 2 to positions 3&4. <br /> it7, <br /> �°"'+ 'o•m•'• uo°m• '• To mount the Vapor Flow Meter(VFM)in the dispenser and make the -a-IoLos••intoe•r••am'• field wiring connections,follow the instructions in the TS-VFM Install DI$ en$eP POWeP Control <br /> u—art+,r�va urea Guide(pin000-2144). 1 o- <br /> .1 <br /> w•,u�,. p Af88 .o ° In order for the console to shutdown a dispenser or all the dispensers H <br /> 1 Console Wiring Connection o In response to an alarm condition,the dispenser power must be routed <br /> C 11 I See Probe Module diagram at right. The VFM is wired to the Probe °o :..r through the Relay Module. Run the Dispenser Power into the Common - <br /> 1mmP+•+"•cl ae(a-ztafl Ts-0�M <br /> Module inside the Console. Wire the Red wire to the+lenninal and the °o „�, ° and out of the Normally Closed contact of each required Relay Module - <br /> 1'–�–+ I--�–+ Black wire to the–terminal. s°oo channel. - – <br /> use 1 1 sumo a 1o <br /> i Z'-;`v o The Relay Module is rated for2Aof continuous current. If the <br /> TS-VPS Installation w o dispenser options created a need for more than 2A,then the 10A Relay - <br /> ® Field Installation - o +° ""' "°°'« Module will be needed. It is a good practice to wire the dispenser <br /> power in a logical order such as Dispenser 1 to Relay Channel 1, <br /> To mount the Vapor Pressure Sensor(VPS)and make the field wiring ° o s»�.�r.a«.� G <br /> connections,follow the instructions in the,TS-VPS Install Guide(p/n o Dispenser 2 to Relay Chandel 2,etc. <br /> 000-2143). There will be only one pressure sensor per ISD System. .�,o •.,...„,.°, <br /> 9 °o <br /> + ® � <br /> Console Wiring <br /> See di <br /> ® _ � See diagram at right. The VPS is wired to the 4-20ma Module inside <br /> u o <br /> the Console. Wire the sensors Blade wire to the+terminal and the °o <br /> P s sensor's White wire to the-terminal. "°' oo ,�",�, <br /> • F _ <br /> I- <br /> E <br /> E <br /> _ e <br /> D <br /> D <br /> a <br /> ,m <br /> C <br /> e4 wa DAT99! lYTIAL.. <br /> INCON SYSTEM WIRING <br /> 18237 N. THORTON ROAD <br /> 0 W. KETTLEMAN LANE <br /> LODI,CALIFORNIA 95240 <br /> Charles E.Thomas Company <br /> 13701 S.Alma Ave <br /> Gardens,Ca.90249 <br /> 1 (310)323.6730 <br /> A FLI J A <br /> rare ® IntT . <br /> P.T.S.,INC. TK3-2 <br /> 1 2 .9 4 6 6 7 - ® 0 10 n 12 13 14 PTSN 2001 17 is <br />