Laserfiche WebLink
• • <br /> FLYING J INC <br /> 333 West Center • North Salt Lake, Utah 84054 <br /> Phone (801) 296-7799 • Fax (801) 296-7800 <br /> 17-- <br /> JUL 1 6 `008 <br /> ENVifiONty'Nri InEALr <br /> July 11,2008 <br /> Aris Cacapit <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton,CA 95202-3029 <br /> Re: Flying J Travel Plaza Lodi Notice of Violation issued during the Underground Storage Tank and <br /> Hazardous Waste Generator Inspection on June 12,2008 <br /> Dear Aris Cacapit: <br /> This letter is in response to the Notice of Violation issued during an Underground Storage Tank and <br /> Hazardous Waste Generator Inspection on June 12,2008. <br /> Response to Underground Storage Tank(UST)Program Inspection Report dated June 12,2008: <br /> Violation. <br /> 1. #2 CCR 2637 Most recent 2"d containment tests done 5-27-05. trod containment tests must be done every 36 months. <br /> Take all necessary precautions to scbeduk this test to be done per CCR 2637.Scbeduk this test immediately to be <br /> conducted by a property licensed,trained,and certified contractor.Submit test results to this office by 7-12-08 or 30 days <br /> after test completed The delay in scheduling the tests was attributable to the wrong date of 11/06/06 <br /> being entered into our tracking system. This error has been corrected and will not occur again. <br /> Tanknology began the SB989 testing on July 9,2008. The testing was expected to be performed over <br /> a period of several days. As of July 12,the testing has not been completed. As soon as the testing is <br /> completed,the results will be provided to your office,within 30 days of completion. <br /> Repeat Violations.- <br /> 1. <br /> iolations.1. #24 CCR 2638(a)Annual monitoring certification&annual line leak detector test. <br /> 2. #26 HSC 25284.2 Annual spill containment testing <br /> These tests were done 5-15-07. These tests should be conducted annually(every 12 months). Take all necessary <br /> precautions to schedule these tests to be done per CCR 2638(a) &HSC 25284.2.Scbedule these tests immediately to <br /> be conducted by a property licensed,trained,and certified contractor.Submit test results to this office by 30 days after <br /> tests are conducted Please see the enclosed test results dated June 26,2008. The delay in scheduling the <br /> tests was attributable to the wrong date of 6/30/08 being entered into our tracking system. This <br /> error has been corrected and will not occur again. <br /> Note.Submit the completed `Return to Compliance"cert.,a corrective action statement for each violation,and supporting <br /> documents by the above noted dates. Please see the enclosed Return to Compliance Certification and the <br /> enclosed annual monitoring certification,spill containment and line leak detector test results. <br />