Laserfiche WebLink
onitoring System Certification <br /> Site Address: 15237 THORNTON RD Date of Testing/Service: 06/26/2008 <br /> F. In-Tank Gauging /SIR Equipment 0 Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes ❑No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No° Was accuracy of system product level readings tested? <br /> ❑Yes ❑No Was accuracy of system water level readings tested? <br /> Yes ❑No* Were all probes reinstalled properly? <br /> ❑Yes ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> "In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes ❑No. E]N/A (Check all that apply)Simulated leak rate: 0 3 g.p.h Q 0.1 g.p.h E]0.2 g.p.h <br /> FX-1 Yes ❑No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes ❑No` Was the testing apparatus properly calibrated? <br /> X❑Yes F]No* ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes [--]No` Q N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No. X❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No* M N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> 1 N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑Yes ❑No• <br /> Yes ❑No" Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> ALL LEAK DETECTORS HAD BLEED OFF OF MORE THAN ONE GAL. <br /> TRIP TIME DSL-1 18 SECS. <br /> TRIP TIME DSL-2 22 SECS. <br /> TRIP TIME DSL-3 14 SECS. <br /> TRIP TIME 87 28 SECS. <br /> TRIP TIME 91 22 SECS. <br /> Page 3 of 3 Based on CA form dated 03/01 <br />