Laserfiche WebLink
D <br /> ,--a U U L�=LL:� <br /> IFIED PROGRAM CONSOLIDATED FdW <br /> UNDERGROUND STORAGE TANK 9 <br /> MONITORING PLAN - (Pae I of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION ENT HEALT 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. ICES 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1' <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Flying J. Travel Plaza <br /> BUSINESS SITE ADDRESS 15237 THORNTON ROAD 103. 1 CITY LODI 104 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> b the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by dualified personnel.[23 CCR.§2632,2634,2638,2641] <br /> _........_.......e9.....P. ........................Y............ ........_................................_._ .. ... <br /> ................................................ ................................................ 490-3a <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHODS) aeekall <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: VEEDER-ROOT/OMNTEC 490-7. MODEL#: TLS-350/800011 490-8. <br /> 490-9. 490-10. <br /> LEAK SENSOR MANUFACTURER: VEEDER-ROOT MODEL#(S): <br /> ........................................................................................................................._.._......_._..._._..._........... 1111.... <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl.[z3 CCR§2643] ago 11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci 490-18. <br /> ............................................................................................................................................................................-..._g:P:................................_..._..........................._g:p........................................_..............................................._....._p........_�............ a9o-�s.:..0...... <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] ago-zo. <br /> ................................................................................................................................................................................................................................._._............................................_.................................................__..............................................................................................................................................................._.._.............................._..._..._........ <br /> ..._._.._ <br /> _� .-. . _.... <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING MTG (23 CCR§2645] TESTING PERIOD: E] a.36 HOURS [I .........................._490-22:..._...... <br /> b.60 HOURS 49an. <br /> ......_..__.................. ................_...................................................................................................................................._..----............................................................................................................................................................................. <br /> . . . <br /> 490-23.5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24. <br /> ................................................................._Q...............1..11...1................... ....._p........_fi........... a9o-2s........__. <br /> .......... ......................... ----...._.....................__._.._._....__.._....._....................................................._............................................................................. 490-26. <br /> ® 99.OTHER(Specify): VISUAL DONE DAILY 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) t all <br /> 01.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-21. <br /> [23 36] SECONDARY CONTAINMENT IS: a.D Y ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29- <br /> §2636] <br /> 90-29. <br /> §2636] <br /> PANEL MANUFACTURER: _A. a90-3o. MODEL#: -Dt11 <br /> a90-31. <br /> LEAK SENSOR MANUFACTURER: a90-3z. MODEL#(S): 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. [I a.YES [Ib.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-35. <br /> _................_..---..__......---...---._..__.............................................................................................................................-1_111-..._.._.......-- ---....._._....._..................................................................................................................._.........................................._..............................._.__....._............__._..__...........---.......... <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§2636] <br /> 490-37. 490-38. <br /> MELD MANUFACTURER(S):FE PETRO MODEL#(S): MLD <br /> .......................................................................................................-----1111... _._............... . .............. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: Ela.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> ....................---'--.........................-'--........................................................................................................_.............__................_.......---..._...---.....__........---._..................................................................................................................................................................................................._.._..--......................_............................... _ <br /> 4................. <br /> ® 4.PIPE INTEGRITY TESTING. 49045, <br /> 490-46. <br /> TEST FREQUENCY:. . --. ® a.ANNUALLY El b.EVERY 3 YEARS ❑ c.OTHE ............................................................. . .......................... . ......................_............. <br /> ® 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ® a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> _ ........................................_...............................-.--.-..---..._............_....Allowed.for monitoring.of unburied emer&.enc'..generator.fue1..P..!P1D&Rx�y.l�_HSC.§25281.5(bx3)..._........_........... <br /> ............ ........._........................................................................................................... ...................................................... ............ .. . 1111... <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)] 490-So. <br /> ....................._.........._............................_....._._........................................................__................................................................................................................... _...................._...._.._.._...___....................................-......._....................................................................................................................._...................._..__.._..................._--.....__.... <br /> _ <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ........... <br /> .............................._.........._........................._......................................._....._._.................._......_....._................................._............................................................._................................................__....................................._...................._.......................................................................................................................I..........................................490-52... <br /> ❑ 99.OTHER(Specify) 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />